OVERVIEW
This new 160,000 sq. ft, 18 storey office building evolves the successful Nova formula with a sustainability conscious design, a progressive approach to work and wellbeing, and a vibrant, connected community in the heart of Victoria, London.
Throughout the commercial space, a range of off-site constructed washrooms & toilet pods were manufactured in Scotland by Modular Interiors. There was a requirement to increase the finished floor height to allow this space to work effectively.
The Knauf GifaFloor system is the ideal partner to this project, particularly to help with efficient programming.
FHB38 1200x600mm installed on a pedestal understructure was specified as it creates a solid monolithic floor which can be installed quickly and allows for follow on trades within hours of install. Compared to traditional wet screeds, there is no long drying time, no mess or complicated health & safety issues.
GifaFloor is the ideal partner to ceramic finishes such as this project. The ceramic tiles can be adhered directly to the panel, without the need for de-coupling layers
The GifaFloor FHB system offers a high acoustic performance, A1 non-combustible fire rating, limits response to moisture or heat and is manufactured from low carbon gypsum fibre.
Knauf GifaFloor FHB Hollow Floor Pedestal System
55 Whitehall, London - Knauf Hugo18 - Overlay to existing Raised Access Floor
Overlay to Raised Access Floor - Knauf GifaFloor FHB18
Tour Alto, La Défense, Paris - Knauf DB Green Raised Floor System
Terrazzo Raised Floor System – Cottam House, Kings Cross, London
MOL campus - Floor and more G40 and NORTEC
INTERNATIONAL RUGBY EXPERIENCE -> FLOOR and more®
GBC 5 - VENTEC - NORTEC- FLOOR and more
Global Tower - Raised floor systems, Heated and chilled metal ceilings, Partitions