OVERVIEW
55 m2 of Grad Thermo Ash 120mm deck boards have been used to great effect by the architects in the modernisation of this semi-detached property for decking, horizontal and vertical cladding, and fencing.
At the back of the building, the living space has been extended by the addition of a garden room, joined together by a deck which runs the length of the garden between the two buildings. Both the main house and the garden room feature a wrap-around canopy and deck.
At the front of the property, the extension and entrance porch have been clad in the same material.
All of these elements have been seamlessly finished using our invisible-fix system, Grad, in Thermo Ash using the same width board throughout. This lovely project really showcases Grad and its versatility.
Hidden-fix Decking System - Grad - Decking System
Hidden-fix Cladding System - Grad - Hidden-fix Cladding System
Kew Bridge, London
Battersea Power Station, London
Google HQ King's Cross, London
White City Place, London
A three-in-one adjustable pedestal for paving and decking
Ceramic tile rail substructure system
Timber Wharf
Brewhouse Balcony Remediation
Accoya for The Environment Agency
Accoya Solution for Armadilla
Western Red Cedar for Sustainable Saunas
Thermowood Redwood for Modern Housing Build