OVERVIEW
Farrat designed and supplied CineSTEEL PRO isolation pads for several of the sound stages included in this project. Working with the design team to develop the most economical solution, the Farrat team were able to turn around a suitable design within a few days to provide a solution.
Steelwork Isolation System – Farrat CineSTEEL PRO
Achieving the highest energy efficiency & sustainability standards by thermally isolating facade connections on a high rise tower in Morocco’s City of Light
Farrat reduces spoilage and increases productivity of a Cupper Press within a £115M can making facility in Europe
ROXY Lanes - Leicester
Ealing Picturehouse Cinema, London
Thorpe Park PureGym
Equinox
Battersea Power Station
Discovery Channel Studios