OVERVIEW
The reservoir had an estimated 180 metres of cracks that needed repair, as well as the main element of the concrete that required coating to waterproof and add durability to the concrete structure. The Reservoir was taken out of commission but it needed to be returned to service as soon as possible. To do this, we looked at the order of the processes to ensure the tight time frames could be met.
Contact SMR PROJECTS LIMITED by clicking the button below to find out which products were used in this case study.