Trident Point

OVERVIEW

Trident Point is a large 8-story building in Harrow, constructed in 2012, housing 142 residential flats, an integrated Morrisons supermarket and car park. All combustible materials had to be removed including polystyrene render, timber cladding, ACM and timber decking. VulcaLap® was used to replace all existing timber cladding with our T&G125 A2 fire rated plank in Veneto Oak finish. Superb works which are expected to last until mid-2024 due to the scale of the building.


Deliveries were lifted by site crane straight onto the high level communal garden site compound. Our technical team have been working closely with Teampol to produce detailed installation drawings to ensure a seamless installation process.

We are looking forward to sharing further project photos soon. 

Products featured in this case study

View all products (2)
VulcaLap® - Aluminium Cladding Panel

VulcaLap® - Aluminium Cladding Panel

More inspiration from Vulcan Cladding Systems

View inspiration
Travelodge

Travelodge

Fairmont

Fairmont

The Bolanachi Building

The Bolanachi Building

More inspiration from Aluminium sheets

View inspiration
Travelodge

Travelodge