Little Ilford, Eastbrook and Eastbury Schools all presented distinctive design challenges in terms of access, safety and flow around the building. Added to this was the ever-present pressure to meet with the required standards for a public sector project, which included the need to use BIM level 2 throughout the design and build process.
No featured products in this case study
Contact ASSA ABLOY Opening Solutions UK & Ireland by clicking the button below to find out which
products were used in this case study.
More inspiration from ASSA ABLOY Opening Solutions UK & Ireland