NBS Source
I'm a manufacturer

University of East Anglia Case Study

OVERVIEW

Ensuring a safe and hygienic working environment amidst the

COVID-19 pandemic became a key priority for UEA. Balancing this

goal alongside UEA’s campus-wide sustainability initiatives and

ensuring optimum employee hydration became a challenge for

CBRE, UEA’s maintenance subcontractor.

Products featured in this case study

View all products (45)
HydroTap UltraCare Classic Plus Instant Filtered Boiling and Chilled Tap

HydroTap UltraCare Classic Plus Instant Filtered Boiling and Chilled Tap

More inspiration from Zip Water

View inspiration
Cala Homes

Cala Homes

ITV

ITV

Merseytravel case study

Merseytravel case study

HEART OF MIDLOTHIAN FOOTBALL CLUB - STADIUM CASE STUDY INSTATAP

HEART OF MIDLOTHIAN FOOTBALL CLUB - STADIUM CASE STUDY INSTATAP

More inspiration from Instant boiling and cold water taps

View inspiration
Pronteau Propure Commissioned for Eco Water Tower Project

Pronteau Propure Commissioned for Eco Water Tower Project

HEART OF MIDLOTHIAN FOOTBALL CLUB - STADIUM CASE STUDY INSTATAP

HEART OF MIDLOTHIAN FOOTBALL CLUB - STADIUM CASE STUDY INSTATAP

INSTANTA TOUCH-FREE SOLUTIONS HELP ROYAL UNITED HOSPITAL PRIORITISE HEALTH AND HYGIENE IN THE WORKPLACE.

INSTANTA TOUCH-FREE SOLUTIONS HELP ROYAL UNITED HOSPITAL PRIORITISE HEALTH AND HYGIENE IN THE WORKPLACE.

INSTANTA GOES ABOVE AND BEYOND TO MEET LONDON NHS TRUST’S REQUIREMENTS - SUREFLOW TOUCH WALL MOUNTED

INSTANTA GOES ABOVE AND BEYOND TO MEET LONDON NHS TRUST’S REQUIREMENTS - SUREFLOW TOUCH WALL MOUNTED