OVERVIEW
Newton Specialist Contractor Arti Construction got involved at an early stage in this new-build project in Golders Green, North West London, to construct an office basement and 4-storey dwelling containing 7 new flats.
Newton HydroBond 403 - Pre-Applied External Waterproofing Membrane for Basement Waterproofing and Gas Protection - Waterproofing Membrane & Gas Barrier
Crystalline Waterproofing of Concrete Newton HydroCoat 104 Super - Crystalline Waterproofing of Concrete
Newton HydroBond 314 Hydrophilic Detailing Bentonite Granules - Bentonite Granules
Waterproofing a Luxury London Hotel
Warwick Court Redevelopment, London
Flooded Shop Basement Refurbishment, Chelsea
Saving a Notting Hill Failed Double Basement
Drumhierny Woodland Holiday Lodges
The Moorings, Wales
The Willows, EnerPHit Retrofit
Forensic Laboratory Backweston
Schneider Electronics Factory - Koster Flooring Systems
Koster Flooring Systems, 96 Middlesex St. London
Koster Floor coatings to a domestic garage.
Aintree Racecourse - Koster Flooring Systems to Grandstand
Park Plaza Hotel in London
Waterproofing to domes on Historic Building
Aintree Racecourse - Koster Flooring Systems to Grandstand
Restoration of the foundations at a wind energy plant