OVERVIEW
As part of a major transformation of Wembley Park, which includes Olympic Way, Wade Stainless Steel Linear Channels and Streamline, and perforated gratings were installed beneath the Olympic Steps to provide an effective and long-lasting drainage solution.
Built by developer Quintain in a joint project with Brent Council, the Olympic Steps come at the end of Olympic Way—the stretch of road linking Wembley underground station to Wembley Stadium. It was named Olympic Way after it was originally constructed for the 1948 London Olympics.
The final stages of this redevelopment were the iconic steps that lead up to the national stadium. The original ramp, known as the pedway, was built as part of the old Wembley Stadium and acted as a bridge over the old coach parks. The Olympic Steps development replaced the outdated, concrete pedway and extended the Olympic Way, increasing the width by 50% and improving accessibility for all visitors in and around Wembley Park. Volker Fitzpatrick was the main contractor on the project.
“Working closely with Mick Hawkins, the Site Manager, the aim of the project was to fulfil the client’s drainage requirements to tight deadlines,” says Brian Holden-Earl, Area Sales Manager. “The area is frequently used by visitors, so it was important to deliver our services within a specific timescale.”
Wade (NE Profile) Stainless Steel Channel
Royal Albert Hall - Alumasc Apex Heritage Cast Iron
Craven Cottage, Fulham FC - Gatic CastSlot
London’s Victoria and Albert Museum - Wade HCE Channel
Waitrose Car Park - Gatic CastSlot
Newfoundland Tower, Canary Wharf - Alumasc Harmer SML & Wade Gullies & Linear