NBS Source
I'm a manufacturer
Breclav Bridge Case Study

Case study

Breclav Bridge Case Study

by Hempel A/S

Hempel has recently brought its expertise to the southern Czech town of Břeclav and the Hohenau-Přerov railway line which runs through it. This inter-station section of the tracks is home to a bridge spanning the Dyje River. Once it became clear that the existing bridge was in poor technical condition, forcing trains to slow down, Firesta was chosen to replace this structure with a track that could cope with locomotive speeds of 160km/h. The original three consecutive structures were to be replaced by a bridge with a single opening, as requested by the Morava River Basin Agency. The planned construction height at mid-span was 15.64m, with a width of 16.9m.

Products related to this literature

View all products (29)
Hempathane HS 55610 - Polyurethane Topcoat - Topcoat / Sealer Coat

Hempathane HS 55610 - Polyurethane Topcoat - Topcoat / Sealer Coat

Hempadur 15553 - Non Ferrous Adhesion Primer - Epoxy Zinc Primer

Hempadur 15553 - Non Ferrous Adhesion Primer - Epoxy Zinc Primer

More literature from Hempel A/S

View all literature (66)
Hempel's Galvosil 15700 Product Information Sheet

Hempel's Galvosil 15700 Product Information Sheet

Hyperloop Case Study

Hyperloop Case Study

Huttenwerke Krupp Mannesmann Case Study

Huttenwerke Krupp Mannesmann Case Study

Břeclav Bridge Case Story

Břeclav Bridge Case Story