Case study
Case study
by Hempel A/S
When it comes to corrosion, nuclear power stations contain some of most hostile environments on the planet. Titan-2 was contracted to build a new power unit at the Leningrad Nuclear Power Plant in Russia, and it needed a highly specialised coating system for the evaporation tower.
Hempathane HS 55610 - Polyurethane Topcoat - Topcoat / Sealer Coat
Hempadur Multi-Strength 45753 - Durable Epoxy Coating - Epoxy Coating
Hempel's Galvosil 15700 Product Information Sheet
Hyperloop Case Study
Huttenwerke Krupp Mannesmann Case Study
Břeclav Bridge Case Story