Case study
Case study
by Hempel A/S
At the new 6,000-seater Jordal Amfi ice hockey stadium in Oslo, Norway, player and spectator safety is a top priority. The stadium owner wanted a coating system which included passive fire protection, so, when Danish based Give Steel was contracted to produce the steel structures, they had to not only meet the customer specification for fire protection but also consider the logistics of the project. “By using Hempafire Pro 315 we secure the high quality fire protection required whilst also benefitting from an efficient application process and low levels of repair on-site. ” Torben Larsen, CEO, Give Steel A/S
Hempafire Pro 315 - Intumescent Coating Fire Protection (Solvent Based) - Intumescent Coating Solvent Based 60min
Hempathane Fast Dry 55750 - Polyurethane Direct to Metal Topcoat - Topcoat / Sealer Coat
Hempafire Pro 315 Fast Dry - Intumescent Coating Fire Protection (Solvent Based) - Intumescent Coating Solvent Based
Hempel's Galvosil 15700 Product Information Sheet
Hyperloop Case Study
Huttenwerke Krupp Mannesmann Case Study
Břeclav Bridge Case Story