Case study
Case study
by Ardex UK Ltd
Residing in Holyrood, Edinburgh, the Scottish Parliament is one of the most prestigious legislators in the United Kingdom. The building, built in 1999, was opened by Queen Elizabeth 2nd, and the first parliament started session in 2004. The building’s impressive post-modern architecture has won it critical acclaim and many respected awards, and has been hailed as one of the most innovative designs in modern Britain.
Contact Ardex UK Ltd by clicking the button below to find out which products were used in this Case study.
RAISED ACCESS FLOORS: PEDESTAL DETAIL SCHEMATIC
ARDEX WPM 200 Waterproof Membrane - Tiling and Rendering Schematic
Wall to Floor Waterproofing Schematic with ARDEX WPM 200 Waterproof Membrane
Swimming Pool Gutter System with ARDEX AM 100