Paxman Avenue Secondary School
Bauder Ltd
Paxman Avenue Secondary SchoolBauderflex bituminous waterproofing system with Euroglaze rooflightsSynopsisPaxman Avenue Secondary School is a new build project situated in Colchester, Essex. The school opened its doors for the first time in September 2019 welcoming 180 year 7 students. It is expected that the school will eventually hold 900 pupils by 2023.Bauder Building BoardProject: Paxman Avenue Secondary SchoolLocation: Colchester, EssexProject type: New buildRoof size: 2500m²Architect: Concertus Design & Property ConsultantsMain contractor: Barnes ConstructionApproved contractor: G.R.M Roofing Company LtdThe specificationThe main contractor, Barnes Construction, was looking for a durable, cost effective roof with longevity, and wanted a waterproofing system which included a comprehensive guarantee with great service and full support from the supplier, and so Bauder’s bituminous system, Bauderflex, was specified. Rooflights were also specified to increase natural light into the building.Bauder’s Rainwater Calculation Software was also used to perform calculations in accordance with BS EN 12056-3:2000 based upon provided data relating to the building’s dimensions, geographical location and the flow rate performance of the selected Bauder rainwater outlet product. This helped to determine the total number of outlets needed for the roof.Products appliedBauderflexA reinforced bituminous membrane system with a choice of self-adhesive and torch-applied membranes that are resistant to high levels of structural and thermal movement. Bauder Euroglaze rooflightsThese rooflights are made to order and the size can therefore be tailor made to fit any roof aperture, with many ventilation and glazing options are available to meet the demands of any type of project.The resultThe client was supported by the Bauder Area Technical Manager, Andy Leggett, from start to finish with help being provided on the design element of the project, and the Bauder approved contractors, G.R.M Roofing Company Ltd, were supported by Bauder site technicians throughout the installation.