Verified by manufacturer 6 months ago
LPS 1175 Single Bi-Folding Gate A1 (SR1) – EAG50010S-A1
Automatic trackless bi-folding speed gates.
Suitable for all commercial, industrial and governmental premises including banks, embassies, warehouses and distribution centres, airports, schools and universities and anywhere there there is a requirement for an automated, security rated, bi-folding speed gate.
A range of automatic trackless bi-folding speed gates with single and double leaf options.
Features and benefits:
Color | Other Manufacturer guidanceProducts can be Powder Coated to any RAL or BS reference. |
Finish | Powder-coated Manufacturer guidanceStandard finish for mild steel fabrication: Pre-Treatment: Blast Cleaned SA2.5 - Primer: Interpon PZ790 (or equivalent) - Topcoat: Interpon D1036 Powder Coat (or equivalent). Minimum application: 80micron. Suitability: Environments up to and including C4 – ‘Industrial areas and coastal areas with moderate salinity’. Design Life Expectancy: 15 years - For decorative appearance is given up to C3 12 years. Over that, life expectancy relates to corrosion protection only. For C5 classification environments or enhanced protection, please contact us to discuss Metallisation (Hot Zinc) or Hot Dip Galvanizing alternatives. |
Material | Steel |
Shape | Rectangle Square |
Width | 5000 mm 10000 mm Bespoke |
Height | 5000 mm |
Warranty description | One year |
Uniclass | |
CAWS | Q50/15 Steel gate Q50/120 Steel gate Q50/20 Gate Q40/45 Gates Q40/40 Steel Q50/130 Gate Q40/570 Gates Q40/560 Steel |
Dimensions | |
Span | Guidance for specification option: Maximum: 5000 mm. Consult the manufacturer's literature and insert requirements. |
Height | 5000 mm. |
Gate leaves | Square hollow section (SHS) vertical bar.358 mesh. |
Hardware | |
Securing | Hydraulically locked in closed position. |
Finish as delivered | |
Worked finish | Blast cleaned, SA 2.5. |
Applied finish | Polyester powder-coated (PPC).Guidance for specification option: Topcoat: Interpon D1036. Consult the manufacturer's literature and insert requirements. |
Primer | Interpon PZ790. |
Certification | LPS 1175: Issue 8, A1 (SR1). |
Safety | Conforms to DHF TS 013. Guidance for specification option: Standard: 2 ch, induction loop amp, CAT3 safety edges, dual height photocells. |
Operation | Automatic. Guidance for specification option: PLC controlled hydraulic system. Manual in the event of power failure. |
Accessories | Not required. Traffic lights. Laser scanner. Light curtain. |
Electrical supply | 230 V. |
Foundation layout | 1 m³, surface/ sub-fix. |
Material | Steel |