NBS Source
I'm a manufacturer

PermaQuik PQ6100 Inverted Roof System

Verified by manufacturer 4 months ago

Radmat Building Products Ltd Third party certifications:
  • BBA Agrément Certificate

    BBA Agrément Certificate

    Certificate type

Liquid-applied hot melt monolithic waterproofing system with integral reinforcement and protective access sheet membrane designed for use in flat roof applications.

Jump to:
BOS
+44 (0)1858 410372 Website

Application

Green and Blue Roof applications on Podiums, Flat Roofs, Balconies and Walkways.

Description

PermaQuik PQ6100 is a one-part, hot-applied, seamless rubberised self-healing hot melt monolithic membrane roofing system. Manufactured in the UK from bitumen, natural rubbers, and a blend of polymers, PermaQuik PQ6100 combines excellent waterproofing performance with toughness, flexibility, and strong adhesion to a variety of substrates. PermaQuik PQ6100 can be installed in zero falls applications and is BBA Certified for ‘lifetime of the building’ in protected (inverted) roof constructions, including green/ blue roofs.


The membrane is to be applied by a Radmat Building Products Ltd approved contractor.


Features and benefits:

  • Fully-bonded to structure.
  • Fire Safety: Approved Document B compliant with comprehensive 3rd-party Fire Certification to BROOF(t4).
  • Complies with Building Insurance Technical Design Standards (e.g. NHBC, LABC, Premier Guarantee).
  • Suitable for new build and refurbishment projects typically over a concrete deck.
  • Effective Total System Thickness: 8-10 mm.
  • Fast rate of installation in temperatures as low as -18°C.
  • ISO 9001/ ISO 14001 accreditation.


Substrates:

  • Concrete: Use traditional methods of concrete curing (i.e. water curing/ wet coverings/ paper/ plastic sheets). Obtain approval from Radmat where concrete curing compounds (other than sodium silicate based) or release agents are proposed.
  • Precast concrete and concrete block: Decks to BS 6229 and BS 8217.
  • Metal/ plywood/ timber boarding: Surfaces to be free of oil, rust, paint or coatings which may inhibit the bond. Plywood must be WBP with durable ply species.


Substrate preparation:

Remove laitance, curing compound and form release agent from surface of concrete slabs by mechanical scarification, grinding, blast cleaning or chemical cleaning. Remove and smooth away any fins and nibs. Make good tie holes and damaged area with latex modified patching mortars, ensuring edges are slightly undercut. Existing surfaces must not be power washed prior to carrying out any works.

Ensure all detailing and flashings are completed before installing the membrane.


Primer:

EshaPrimer – a quick-drying bitumen-based primer for concrete surfaces. EshaPrimer requires between 1 and 4 hours to completely dry. EshaPrimer must be completely dry before applying the bitumen membrane. For additional protection two layers can be used.


BlackOut Roofing Surface Conditioner - a low viscosity, high penetration, cold applied bituminous solution designed to prime and seal porous roof surfaces prior to the application of bituminous materials. BlackOut Roofing Surface Conditioner requires between 1 and 4 hours to completely dry. BlackOut Roofing Surface Conditioner must be completely dry before applying the bitumen membrane. For additional protection two layers can be used.


Insulation materials:

Radmat recommend the use of ProTherm Inverted Insulation products in accordance with BS EN 13164 or the subject of a current BBA Certificate.


Water Flow Reducing Layer (WFRL):

Radmat ProTherm XPS X MK Water Flow Reducing Layer laid loose with 300 mm laps prevents water from reaching the waterproofing layer and almost completely eliminating the rainwater cooling effect.


Surface Protection:

A minimum loading of 80 kg/m² to prevent the effects of floatation is required on all inverted roofing applications, additional loading may be required in accordance with wind-uplift calculations. This can comprise of Radmat MedO Green Roof finishes, Washed Stone Ballast, Pavers and other trafficable surfaces. 

General information

Color

Black

Material

Bitumen

Polymer

Rubber

Length

Bespoke

Width

Bespoke

Height

10 mm

Warranty description

40 year

Guidance for specification option:

Standard warranty duration.

Uniclass

Ss_30_40_30_42 Liquid-applied inverted roof covering systemsPrimary

CAWS

J30/150 Hot-applied damp-proofing

J30/20 Hot-applied damp-proofing

J31/130 Inverted roof coating

Specification data - Liquid-applied inverted roof covering systems

Preparation

-

Horizontal work

Not required.

EshaPrimer.

Guidance for specification option:

Coverage: 8–16 m²/ L.

BlackOut Roofing Surface Conditioner.

Skirtings and vertical work

Not required.

EshaPrimer.

Guidance for specification option:

Coverage: 8–16 m²/ L.

BlackOut Roofing Surface Conditioner.

As Horizontal Work.

Carrier membrane

-

Type

Not required.

Vedatop SU.

Fixing

Not required.

Self-Adhesive.

Torch-on.

Liquid-applied waterproofing

-

Type

PermaQuik PQ6100 Monolithic Hot Melt System.

Reinforcement

PermaQuik PQ2017 Reinforcing Fabric.

Surface treatment

Standard Protection Sheet XL.

Texsa Root Barrier P.

EshaFlex 370 FireSafe Mineral Cap Sheet.

Insulation

-

Type

ProTherm G XPS X 300 SL.

ProTherm XPS X ULTRA 300 SL.

ProTherm Quantum PLUS+ Vacuum Insulation.

ProTherm Quantum Hybrid System.

ProTherm G XPS X 500 SL.

ProTherm G XPS X 700 SL.

ProTherm FOAMGLAS® INVATHERM System.

Fixing

Loose-Laid.

Loose-Laid with ship lapped joints.

Loose-Laid with min. 150 mm staggered overlaps between layers.

Water control layer

Radmat ProTherm XPS X MK Water Flow Reducing Layer.

Ballast

Min. 50 mm of 20—40 mm rounded washed stone ballast.

Min. 75 mm of 20—40mm rounded washed stone ballast.

Min. 50 mm rounded washed stone ballast beneath surface finishes.

Fill to perimeter upstands

Not Required.

Min. 50 mm of 20—40 mm rounded washed stone ballast.

Min. 75 mm of 20—40 mm rounded washed stone ballast.

Min. 50 mm rounded washed stone ballast beneath surface finishes.

Proprietary metal channel drain.

System accessories

Not required.

Termination and flashing bars.

Bitumen compatible sealant.

Bitumen compatible adhesive.

PQ2060 Detailing Membrane.

PQ2061 Detailing Membrane.

PQT1520 Double-sided Sealing Tape.

ProScreed X Levelling Screed.

EshaPur 95/25 Oxidised Bitumen.

Sustainability data

Contains Red List materials

Yes

Country of material origin

Europe

Country of product manufacture

United Kingdom

Recyclability

0

Recycled content

As defined in clause 7.8 of BS EN ISO 14021

0 %

BIM objects

BOS

NBS BIM Object Standard

This BIM object has been authored to meet the requirements of the NBS BIM Object Standard.

Find out more about the NBS BIM Object Standard.

Platform Compatible Version
IFC

IFC2X3

1

Revit

Revit 2016

3

Third party certifications

BBA Agrément Certificate

BBA Agrément Certificate

97/3336 PermaQuik PQ6100

Literature

PermaQuik PQ6100 Hot Melt Brochure

PermaQuik PQ6100 Hot Melt Brochure

PermaQuik PQ6100 Hot Melt PDS

PermaQuik PQ6100 Hot Melt PDS

PermaQuik Peel Test Procedure Rev1

PermaQuik Peel Test Procedure Rev1

PQ6100 Substrate Preparation Guidelines

PQ6100 Substrate Preparation Guidelines

Case studies

Crossrail Place

Crossrail Place

Library of Birmingham

Library of Birmingham