OVERVIEW
Termi Home & Commercial (SA) were proud to be a part of the historic Norwood Oval Redevelopment project in Adelaide, South Australia. As one of the most iconic football grounds in Adelaide only a non chemical termite management solution would do. We designed and installed the Termimesh System keeping in mind both the historical significance and the new facilities.
The suitability of the Termimesh system for this project is based on its flexibility, which was necessary due to complex external geometry of the new construction and integration with the existing buildings. This presented challenges in performing remedial work. For example the Sir Edwin Smith Grandstand is heritage listed meaning minimal work was allowed to the external façade.
This is where the strength of our termite management system lies. It can be customised for each individual project. Our estimating and design team will work alongside the architect, marking up plans and explaining how the system is applied to the design. Which in the case of the Norwood Oval was extremely important. We are on hand during the construction phase to iron out any challenges that may arise ensuring the installation process is simple, smooth and straightforward.
Termimesh has maintained our position as market leader in termite protection in the South Australian construction industry for over 25 years, with a strong domestic and commercial portfolio. We are one of few companies that are triple certified to AS48001, ISO9001 and ISO14001 which delivers additional peace of mind for our clients.
CONSTRUCTION TEAM
Schiavello Construction
Our team has a good relationship with the lead contractor, Schiavello, having worked on past projects together. They knew our capability and after a detailed review of the construction programme, we were sure we could meet their requirements.
As a supporter and sponsor of the Norwood Football Club, Schiavello recognised the significance of the project for the community.
PROJECT DETAILS
Client City of Norwood, Payneham & St Peters.
Specifying Architects Tridente Architects
Installation Year 2019
Installation Duration 7 months
Project Value $9 mil
TECHNICAL DETAILS
Installation Type Number
Service penetrations 200
Column blockouts 7.5 LM
Cluster penetrations 4
Control joints 315 LM
Construction joints 73 LM
Saw cut service penetrations 147 LM
Concrete slab pours Numerous
Perimeter 147 LM
Key Termimesh Personnel
Termimesh Termite System
Mother Teresa Catholic College, WA