OVERVIEW
Client: Bristol City Council
Consultants: Chapman Taylor Architects & Arup Design
Main Contractor: Bouygues UK
Specialist Contractor: Optimum Dry Wall Systems
Main Products Used: Emshield DFR-2 System
On the site of the former ambulance station adjacent to Castle Park, the largest urban green space in Bristol, this development is designed to provide 375 new homes, with a mixture of build-to-rent and affordable housing units. This comprises a new 26-storey tower, which will be the tallest building in Bristol, together with a 10-storey block, plus a third central building connecting the two, and providing a business centre and leisure facilities for the residents, as well as direct access to the park. The architects designed wide structural expansion joints to accommodate the anticipated levels of movement between the different building structures, as well as in and between the main reinforced concrete floor slabs and the structural frame of the building. They also wanted to reduce any noise transmission through the joints and to ensure that the designated levels of fire protection were maintained, which meant that the joints had to be treated to provide 2-hours fire resistance. To meet all these demands, the answer was a single solution using Emshield DFR-2 (horizontal floor joints) / WFR-2 (for vertical wall joints) systems. These produce a watertight joint, that can accommodate high movement up to 100% (+/- 50%), greatly reduce sound transmission (STC 62; OITC 52), and which are CE Marked to EN-1366-4 for up to 4 hrs fire resistance.
Fire Resistant Floor & Wall Movement Joints - Emshield DFR / WFR CE
Emseal Colorseal seals joints between precast façade panels at the Broadway Redevelopment In London
Emseal SJS System to Seal Ramp Joints at Trafford House Car Park, Old Trafford, Manchester
Emseal SJS System solves leaking deck expansion joint problems for the Elmsleigh Shopping Centre at Staines in Middlesex
Emseal SJS Selected for Wide Deck Joints at Manchester Airport T-2 Multi-Storey Car Park, Manchester
Emshield DFR-2 has been used to successfully sealing & ensuring 2-Hour Fire Resistance, in the more than >100 mm Wide, High Movement, Structural Floor Joints in the Battersea Power Station Redevelopment
Emshield DFR-2 Seals Wide (100mm +), High Movement (+/- 50%), Fire Resistant (min 2hrs), Structural Deck & Floor Movement Joints at the Wood Wharf Development in London
Emseal Acoustic & Thermal Movement Joint Sealing for the New Aviva Studios, Manchester - The Factory