OVERVIEW
Studley Castle is an exquisite hotel with over 180 years of history in the heart of rural Warwickshire. Built in 1834 in the Gothic Revival style, this project aimed to maintain a modern outlook. A renovation of the castle was carried out, costing £50 million; this 4,200m² restoration development is now a luxurious 200-room hotel castle blending the modern with the original ancient facades.
Cellecta ScreedBoard 28 was specified by PWP Architects in this luxury refurbishment to improve upon its existing acoustic properties. It's high density, and unique resilient layer provides unrivalled acoustic performance, typically 5dB better than legislative requirements.
Rob Gould was awarded the contract to maintain and convert the iconic castle in Studley.
ScreedBoard® 28 - Dry Acoustic Gypsum Overlay Board
YELOfon® ES and FS Perimeter Edge Strips - Acoustic Edge Strips for Floor Perimeter
Wisteria Lodge, Broadstone
Wick Lane, Hackney Wick
Admirals Quay, Southampton
Alexandra House, Portsmouth
Kings Cross Residential Acoustic Flooring System
Duhamel Place
Merchant Quay
Case Study: Redevelopment of the Historical Ice Works Building in Worcester
Grade II listed building soundproofing, Sheffield
Rose Mount, Douglas apartment conversion acoustic design
Soundproofing a multi-use residential and commercial building, Ellesmere Port
Soundproofing internal walls and floors in apartment conversion, Hertfordshire