OVERVIEW
Client: Canary Wharf Group
Consultant: Adamson Associates Architects
Main Contractor: Kilnbridge Construction Ltd
Main Products Used: Emseal DFR-2 Systems
Wood Wharf Development is certified as a BREEAM Outstanding rated, sustainable mixed-use development that covers a 23-acre site. It consists of 6 individually designed building structures that provide 2 million square feet of curated workspaces and offices, more than 3,500 new residential homes and 500,000 square feet of retail space. The site is being developed as a new 5G and Wi-Fi-6 enabled, London District to include more than 9 acres of interconnected riverside leisure space with boardwalks, squares, and parks to create an oasis of urban green space. The new multistory building structures were designed with 50mm wide structural expansion joints between floor slabs to accommodate the high levels of thermal movement anticipated, as well as the vibrations from traffic and other loadings. These joints also had to minimise any noise transmission through the floors and provide a minimum of 2-hours fire resistance, which is a key reason the consultants selected the Emshield DFR-2 System as it could easily meet all these stringent requirements. In fact the innovative Emshield DFR-2 System can accommodate more than 100% joint movement capability and is CE Marked to EN-1366-4 for up to 4 hrs fire resistance. This unique Emseal solution also has the advantages of not requiring any potentially damaging mechanical fixings into the structure, as it is easily bonded into the joint, with access only required from above.
Fire Resistant Floor & Wall Movement Joints - Emshield DFR / WFR CE
Emseal Colorseal seals joints between precast façade panels at the Broadway Redevelopment In London
Emseal SJS System to Seal Ramp Joints at Trafford House Car Park, Old Trafford, Manchester
Emseal SJS System solves leaking deck expansion joint problems for the Elmsleigh Shopping Centre at Staines in Middlesex
Emseal SJS Selected for Wide Deck Joints at Manchester Airport T-2 Multi-Storey Car Park, Manchester
Emshield DFR-2 has been used to successfully sealing & ensuring 2-Hour Fire Resistance, in the more than >100 mm Wide, High Movement, Structural Floor Joints in the Battersea Power Station Redevelopment
Emshield DFR/WFR - CE has been specified and successfully installed on the Castle View Development in Bristol - Successfully Sealing and providing increased Fire Resistance to the Wide, High Movement, Structural Movement Joints
Emseal Acoustic & Thermal Movement Joint Sealing for the New Aviva Studios, Manchester - The Factory