OVERVIEW
Hamilton Gallery’s international reputation, required Lazenby’s master craftsmanship, to maintain exacting standards. Over 150m² was installed quickly and efficiently, so that the Gallery remained closed for the shortest period possible.
The deceptively simple interior design, features a 100mm Lazenby polished concrete floor throughout. The C35 mix was pumped into the period building, in one day, with concrete lorries arriving at pre-arranged times. Logistics are carefully managed, to avoid delays in the pour and avoid multiple lorries having to park in busy London streets.
The floor was installed over 20 years ago and is still there today. However, it now features a lightly exposed aggregate finish, as it was accidentally painted and Lazenby were asked to bring the floor back to its albeit, slightly altered former glory.
The floor now features a 'Salt & Pepper' finish with a slight fleck of aggregate showing.
Lazenby Polished Concrete
The Firs
Portobello Staircase
Cannon Green Staircase
Oxfordshire House
The Firs
Cannon Green Staircase
Hawley Wharf
Ox Barn