NBS Source
I'm a manufacturer

Redevelopment of Insworke Mill, Lewis Decking used for acoustics and under floor heating

OVERVIEW

Insworke Mill was originally built in 1590 and survived as a working Mill until the First World War. After falling into disrepair it’s now undergoing a major refurbishment to convert it to its new life as commercial properties to the ground floor with a luxury residential dwelling above. To the first floor a Lewis® Deck/screed solution was used to provide acoustic separating floors with timber beams left exposed, replicating the original beams. On the ground floor; Lewis® was used as part of a warm floor solution above the cellar areas. U/F heating was incorporated in all floors.

Products featured in this case study

View all products (4)
Lewis Deck Floor - Steel and Concrete composite floor deck

Lewis Deck Floor - Steel and Concrete composite floor deck

More inspiration from CDI Innovative Construction Materials Ltd

View inspiration
New Lewis Deck Installation Videos

New Lewis Deck Installation Videos

New house, Perth, Scotland

New house, Perth, Scotland

Op-Deck to the Curly House

Op-Deck to the Curly House

2 Storey Beach Front House, Seadune.

2 Storey Beach Front House, Seadune.

More inspiration from Steel profiled sheet

View inspiration
Conversion of a Grade II listed building into apartments

Conversion of a Grade II listed building into apartments

Lewis Deck in an ICF Build.

Lewis Deck in an ICF Build.

Graven Hill self-build ICF houses with concrete upper floors

Graven Hill self-build ICF houses with concrete upper floors

Sinclair Meadows – Zero Carbon Code 6 Housing

Sinclair Meadows – Zero Carbon Code 6 Housing