OVERVIEW
The Project
The completion of Birmingham City University - Curzon B & Royal Birmingham Conservatoire forms part of the University’s £260 million dedicated investment into new and advanced facilities.
Designed by Associated Architects to provide 100,000 square feet of additional facilities the £31 million Birmingham City – Curzon B Building officially opened in January 2018. The facility offers teaching and learning space for 3,000 students and staff.
The Challenge
Propose a robust cubicle system suitable for a heavy foot fall environment.
Deliver all products compliant to BIM Level 2.
Manufacture bespoke vanity troughs in a wave design.
Manage production, delivery and installation to the high standards set by the industry.
The Solution
As a local preferred supplier Excelsior were engaged by Birmingham based Willmott Dixon to supply and install the washrooms. T-Line Cubicle Range offered the perfect solution, with an extruded aluminium frame, inclusive of pilaster and headrail, coupled with Solid Grade Laminate Doors and Divisions ensure a robust cubicle that will stand the test of time.
T-Line HPL Washroom Cubicle - Modern, Minimalist Washroom Cubicle
T-Line SGL Cubicles - Cubicles
Dudley Leisure Centre
Altrincham Business Park
Dudley College
Aston University
Concierge Camping
Honiton Swimming Pool
Ysgol Y Bynea
Ysgol Saron