OVERVIEW
The scheme includes infilling one third of Alexandra Dock with 780,000 m3 of material and reclaiming 7.5 ha of the river to create a new 650m quay wall, which can accommodate three offshore wind installation vessels.
Construction will also involve dredging a new berth pocket, completion of earthworks and surfacing, building internal access roads and service networks, construction of a new Roll-on / Roll-off ramp and demolition of some existing buildings.
Our Hody system was used in the 3 Primary Substations on the site to create the first floor decks of the steel framed buildings within the Alexandra Dock project.
Hody® Profiled Steel Sheets - Trapezium Shaped Permanent Formwork
New Lewis Deck Installation Videos
New house, Perth, Scotland
Op-Deck to the Curly House
2 Storey Beach Front House, Seadune.
Conversion of a Grade II listed building into apartments
Lewis Deck in an ICF Build.
Redevelopment of Insworke Mill, Lewis Decking used for acoustics and under floor heating
Graven Hill self-build ICF houses with concrete upper floors