NBS Source
I'm a manufacturer

AirMaster Case Story Grammar School

OVERVIEW

The mechanical consultants, Hamson Barron

Smith (HBS) of Haywards Heath, specified AirMaster

mechanical ventilation units with heat recovery (MVHR). To meet the demanding requirements of BB101, two units were installed in each of the four laboratories and one in each of the two computer labs and single training room.

Installing AirMaster units ensures that while the

laboratory airborne chemicals are efficiently extracted,

much of the harmful air pollution from outside is also

filtered out before it enters the room. The effective

filtration integrated into the AirMasters provides a

safeguarded environment for the students, free

of pollutants.

Products featured in this case study

View all products (13)
AirMaster MVHR - Mechanical Ventilation Heat Recovery

AirMaster MVHR - Mechanical Ventilation Heat Recovery

More inspiration from SAV Systems

View inspiration
Pressure Independent Thermostatic Radiator Valves Case Study

Pressure Independent Thermostatic Radiator Valves Case Study

AirMaster Case Story Norwich Aviation

AirMaster Case Story Norwich Aviation

AirMaster Case Story Southcraig School

AirMaster Case Story Southcraig School

AirMaster Case Story Furze Down

AirMaster Case Story Furze Down

More inspiration from Supply and return air-handling units

View inspiration
AirMaster Case Story Norwich Aviation

AirMaster Case Story Norwich Aviation

AirMaster Case Story Southcraig School

AirMaster Case Story Southcraig School

AirMaster Case Story Furze Down

AirMaster Case Story Furze Down

Controlled fresh air and heat recovery ventilation for Hereford Council Leisure Pool

Controlled fresh air and heat recovery ventilation for Hereford Council Leisure Pool