NBS Source
I'm a manufacturer

Allenby Barracks

OVERVIEW

Our purpose


On behalf of Amye Defence Services, Acclaim Contracts Ltd was commissioned to address the aging roof of the building, which was leaking despite receiving patch repairs over the past 20 years. The Ministry of Defence’s Project Allenby/Connaught demonstrates the Government’s commitment to maintaining defence estates.

The £1.45bn scheme is a 35-year commitment to providing modern, high quality, fully serviced, purpose built living and working accommodation for 18,700 soldiers. It involves the new build and refurbishment of more than 550 buildings across Salisbury Plain and Aldershot, including upgrading Allenby’s Building 51, otherwise known as the Sports Pavilion.


Our solution


Acclaim turned to Langley to provide all the material necessary to complete the work. After stripping the original roof to the existing plywood deck, the team fitted new treated timber around the perimeter and new uPVC fascia. The current edge trims, perimeter check kerbs, and extended flues were removed to ensure regulatory 150mm clearance was achieved once the new roof covering was installed. Langley’s HT180 attachment layer was loose-laid and nailed into place to provide appropriate protection to the timber deck while the “hot works” above were undertaken. Langley’s TA-20 Flat Roofing System was installed across the roof area, with insulation to achieve the regulatory requirement of 0.18W/m2K. SA-20 Flat Roofing Detailing System was used in fire risk areas, in line with Safe2Torch guidance. The range of Langley’s TA systems complies with Broof(t4) classification and has a Local Authority Building Control (LABC) assured accreditation. Under MOAT 31, Langley’s Parafor 30 GS (cap sheet to the TA system) achieves a ‘resistance to damage” rating of R4. It is independently certified by the BBA to deliver a life expectancy of at least 40 years, one of the longest available in the UK.

Acclaim fitted Langley’s ParaFurb Refurbishment Outlets to upgrade the internal outlets where possible, cleaning and priming those where the design precluded the use of ParaFurb. We installed New Code 5 lead pipe sleeves to flues and hot pipes to a minimum 150mm above the waterproofing. In addition, Langley’s ParaTrim GRP Edge Trim was fitted to all the kerbs.

“It carried great weight with us that Acclaim worked in partnership with Langley, who offers an independent insurance-backed guarantee. That is indicative of pride and confidence in its work, giving synergy with Amey. It also gives us, and our client the Ministry of Defence, that the refurbished estate at Allenby will serve and be fit for purpose for decades to come.”


Will Loates, Service Delivery Area Manager, Amey

Products featured in this case study

View all products (14)
Langley TA-20 W Flat Roofing System

Langley TA-20 W Flat Roofing System

More inspiration from Langley Waterproofing Systems Ltd

View inspiration
Salisbury Walk

Salisbury Walk

Jesus College

Jesus College

Waverley Court

Waverley Court

Blackhorse Lane

Blackhorse Lane

More inspiration from Reinforced bitumen membrane warm roof covering systems

View inspiration
Jesus College

Jesus College

Waverley Court

Waverley Court

Colchester County High School

Colchester County High School

Epsom Hospital

Epsom Hospital