OVERVIEW
Project: The Renaissance
Date: 2022
Background:
· APL’s strong supply-chain relationships enabled the correct specification of aluminium and paint coating for a marine environment to be secured at a time of severe material shortages
· APL’s design team worked closely with the installer, helping to detail the challenging interfaces between different cladding types
· APL provided all structural calculations
Systems:
· 1,000m² of APL SnapLoc™ traditional standing seam system on marine-grade aluminium with a PvF2 coating in RAL 9002 and RAL 9006
· APL Tritherm™ GALV sub-framing to SFS and concrete substructure for APL SnapLoc™ areas
· 100m² of APL Custom Bespoke Newton-range castellated profile in aluminium
· PPC aluminium infill panels and copings
· Complex bespoke feature flashings in PPC aluminium
· All flashings, fixings and accessories
Building Location:
· Hove
SnapLoc Standing Seam Wall Cladding System - APL SnapLoc™ - Traditional Standing Seam Cladding
APL Case Study - StrongBak™ - Ball Corporation – New Bottling Plant
APL Case Study - StrongBak™ - BMW Swindon Press Shop
APL Case Study - StrongBak™ - Derry Sports Complex
APL Case Study - AP50HR Half-Round Cladding - Bidfoods, Glasgow
APL Case Study - StrongBak™ - Ball Corporation – New Bottling Plant
APL Case Study - StrongBak™ - BMW Swindon Press Shop
APL Case Study - StrongBak™ - Derry Sports Complex
APL Case Study - AP50HR Half-Round Cladding - Bidfoods, Glasgow