The design and engineering of British Airways i360 is as impressive as it is innovative. Such an innovative attraction needs to stay attractive whilst maintaining safety of its tourists. Did you know that 90% of slip accidents occur on wet or contaminated floors? By not effectively trapping dirt, cleaning costs can skyrocket to £600-£1000 per kg of soil removed. This can often lead to a reception that is unattractive.
At INTRAsystems we have always believed that Entrance Matting is the first line of defence in preventing the ingress of dirt and moisture into the building.