OVERVIEW
The refurbishment was created with a light touch but transformed the main building entrance and reception, upper-floor common areas, WCs and half of the office floors. Work was undertaken whilst the other office floors remained in occupation.
The reception refurbishment reused many of the existing high-quality materials, which complements terrazzo, but also helped to transform the space into a contemporary interior whilst retaining the grandeur and sense of arrival.
Terrazzo is also in harmony with the edgier interventions such as the distressed metal ceiling raft and lighting which have contributed to the building appealing to the next generation of banking tenants with start-up bank Monzo taking the vast majority of vacant space in the building.
The gentle approach to refurbishment and the reuse of materials as well as the use of terrazzo contributed to meeting British Land’s exacting sustainability targets.
Contact In Opera (UK) Limited by clicking the button below to find out which products were used in this case study.
Exchange Square
The Body Studio, Selfridges
Quay Quarter Tower
The Royal Academy of Arts