NBS Source
I'm a manufacturer

Caernarfon Station

OVERVIEW

The Project


Ffestiniog and Welsh Highland Railway’s new Caernarfon Station forms part of a £15m Waterfront regeneration project led by Gwynedd County Council.

Designed by Architects Purcell to include catering and retail facilities, the project hopes to bring an extra 5,000 visitors to the area as well as boosting the local economy.

 

The Welsh Highland Railway is the UK's longest heritage railway, having been extended to a 25-mile line starting from beneath the castle walls in historic Caernarfon, the railway climbs to the foot of Snowdon before dropping again to sea level at the harbour in Porthmadog.

 


The Challenge


Provide a washroom package befitting the iconic new station building.

The station will need to cope with up to two hundred people at departure / arrival times with facilities to tell the story of both the waterfront and railways.


Produce first class facilities capable of withstanding the rigors of high traffic footfall.


 

The Solution

 

Excelsior Mariner range offers extremely high levels of durability. Free standing, 12mm solid core panels are extremely robust and vandal resistant.


Solid grade laminate used for the vanity units ensure water resistance and a solid, hard-wearing surface, guaranteed to withstand the test of time.

Products featured in this case study

View all products (28)
Mariner SGL WC Cubicles  - Solid Grade Laminate Cubicle

Mariner SGL WC Cubicles - Solid Grade Laminate Cubicle

More inspiration from Excelsior Panelling Systems Ltd

View inspiration
Dudley Leisure Centre

Dudley Leisure Centre

Birmingham City University

Birmingham City University

Altrincham Business Park

Altrincham Business Park

Dudley College

Dudley College

More inspiration from Panel cubicle systems

View inspiration
Concierge Camping

Concierge Camping

Honiton Swimming Pool

Honiton Swimming Pool

Ysgol Y Bynea

Ysgol Y Bynea

Ysgol Saron

Ysgol Saron