OVERVIEW
Lionweld Kennedy designed, fabricated and supplied the modular flat packed steel and GRP grating and stair treads to the 'Clair Ridge Oil Filed' for Hyundai Heavy Industries.
Using both steel and GRP, we created an efficient solution for their flooring. Both materials thrive in harsh environments, which is why Lionweld Kennedy supplied an range of our products to cut down on costs, while maintaining high strength.
Clair Ridge is the second phase of development of the Clair field which, with an estimated eight billion barrels of oil in place, is the largest undeveloped hydrocarbon resource on
the UKCS.
The £4.5bn investment involves two new bridge-linked platforms.
GRP BridgeDeck
Utility Grating
GRP Flowtread
GRP FlowDeck
GRP Flowgrate
GRP FlowGrate Micromesh
Steel Stair Treads - 35mm Ball Proof - Open Steel Grating
Safegrid Forge Welded Steel Grating - 20mm Ball Proof - Steel Grating and Open Mesh Flooring
Chirag Oil Field
GDF Suez Cygnus Bravo
Shah Deniz
Solan Topside
Stauning Whisky’s distillery - gratings
New Air BP Jet Fuel Station - plank gratings
HMS Victory - plank gratings
Platforms and stairs for grandstand systems - plank gratings
West Ham Stadium, London
Chirag Oil Field
GDF Suez Cygnus Bravo
Solan Topside
Chirag Oil Field
GDF Suez Cygnus Bravo
Solan Topside
West London Platform Extensions
New Air BP Jet Fuel Station - plank gratings
Chirag Oil Field
North Pole Depot
Old Trafford
Chirag Oil Field
West London Platform Extensions
Chirag Oil Field