NBS Source
I'm a manufacturer

Coca-Cola Enterprises, Wakefield

OVERVIEW

REQUIREMENT: Able-bodied access to the cabin. 


ADDITIONAL INFORMATION: We quoted and produced technical and CAD drawings, with reference to the finished floor height measurement supplied by the modular building company.


END RESULT:

Our expert installers fitted a step system as shown.

 

FEATURES INCLUDED:

  •  Mesh Platform - self-draining mesh allows water to pass through rather than collect on the surface.
  • Trombone Ends - these are added to the ends of a step system to prevent clothes catching.
  • Telescopic Legs - these can be adjusted to accommodate different threshold heights.
  • Standard Continuous Handrail - this handrail system ensures users always have support to hold onto.
  • Standard Colour Black - ramps are powder-coated black, to create a durable finish that is tougher than conventional paint.


THE COMPLETE RAMP PACKAGE:

An all-inclusive, stress-free option which we managed in-house.

This package includes a site survey (if applicable), quotation, CAD and technical drawing, supply, and installation. 


No featured products in this case study

Contact Rapid Ramp Limited by clicking the button below to find out which products were used in this case study.

More inspiration from Rapid Ramp Limited

View inspiration
Hathersage Road Car Park, Manchester Royal Infirmary

Hathersage Road Car Park, Manchester Royal Infirmary

Carlisle Park Pavilion Cafe, Morpeth

Carlisle Park Pavilion Cafe, Morpeth

Holy Cross Preparatory School, Kingston upon Thames

Holy Cross Preparatory School, Kingston upon Thames

Front Door Ramp, Woking

Front Door Ramp, Woking