PROJECT BACKGROUND: The construction of weighbridges and a weigh cabin.
The cabin will be elevated 1.5m above ground level on support columns.
Lorries will drive up to the cabin for initial checks before the weighbridges are used to calculate the load by weighing the lorry when empty and when loaded.
REQUIREMENT:
A walkway around the cabin in a L shape with steps to allow the site operatives access.
ADDITIONAL INFORMATION:
2D and 3D CAD drawings were created by our designer in-house. These were given to the client with their quotation.
END RESULT: A Rapid Ramp platform was raised around 1.5 metres high and included steps.
The appropriate height was reached with adjustable telescopic legs. Plus, cross bracing was achieved using longer length tubes to ensure rigidity under all platform legs.
The system was completed within a quick three-day turnaround time.
FEATURES INCLUDED:
Contact Rapid Ramp Limited by clicking the button below to find out which products were used in this case study.
Hathersage Road Car Park, Manchester Royal Infirmary
Carlisle Park Pavilion Cafe, Morpeth
Holy Cross Preparatory School, Kingston upon Thames
Front Door Ramp, Woking