NBS Source
I'm a manufacturer

Gloucester Business Park

OVERVIEW


The Project


Gloucester Business Park, Plot 1420, takes the form of three buildings grouped around a landscape courtyard, the buildings are split into six self-contained units which are sub-divided floor by floor.

 

Gloucestershire is excellent for transport links & the parks modern and flexible working environment also provides sufficient parking for all employees and visitors

 

Plot 1420 won Kier Central Site of the Quarter for Jan – March 2015. The site scored 100% when externally audited by the BSI for Quality and Environmental Performance.


The Challenge


Manufacture, deliver and install premium quality system befitting the development and the client’s requirements.


Offer complimentary system for use in the shower areas &

produce Solid Surface troughs to bespoke lengths, exceeding 3000mm.

 

The Solution


Excelsior Flush 44 Full Height system provides a sleek flush fronted façade delivering the upmost in quality, design and privacy. 


Complimentary Mariner Cubicles finished in matching laminate installed in the wet areas. 12mm Solid Grade Laminate is recommended for shower enclosures the core material is manufactured with phenolic resins which ensures the self-supporting panels are impervious to water penetration and will stand the test of time against water/moisture ingress


All Cubicles and Vanities are finished in Oak Classic High-Pressure Laminate along with a Corian Vanity Top in Designer White. All working to complement each other and deliver a harmonious natural colour scheme generating a tranquil & calming atmosphere


Nick Flexen-Cook at Kier Construction has said – “Plot 1420 was delivered by the best, highest performing team that I have ever been privileged to be a part of. The tenant is rightly delighted with their facility which exceeds their expectations.”


Specification

Product Range: Mariner

Doors: 12mm Compact SGL Sonae Oak Classic M3817

Pilaster: 12mm Compact SGL Sonae Oak Classic M3817

Partition: 12mm Compact SGL Sonae Oak Classic M3817

Ironmongery: Stainless Steel


Client:

Goodman

Contractor:

Kier

Architect:

Frank Shaw Associates Ltd

Location:

Gloucestershire

Products featured in this case study

View all products (28)
Magma Solid Surface Washtrough Units - Washtrough / Trough

Magma Solid Surface Washtrough Units - Washtrough / Trough

Flush44 HPL (Flush Fronted) WC Cubicles - Cubicle

Flush44 HPL (Flush Fronted) WC Cubicles - Cubicle

Mariner SGL Duct Panel IPS - IPS Duct Panel

Mariner SGL Duct Panel IPS - IPS Duct Panel

More inspiration from Excelsior Panelling Systems Ltd

View inspiration
Dudley Leisure Centre

Dudley Leisure Centre

Birmingham City University

Birmingham City University

Altrincham Business Park

Altrincham Business Park

Dudley College

Dudley College

More inspiration from Panel cubicle systems

View inspiration
Concierge Camping

Concierge Camping

Honiton Swimming Pool

Honiton Swimming Pool

Ysgol Y Bynea

Ysgol Y Bynea

Ysgol Saron

Ysgol Saron

More inspiration from Duct and wall panel lining systems

View inspiration
Aberavon Aqua Splash

Aberavon Aqua Splash

Ysgol Y Bynea

Ysgol Y Bynea

Ysgol Saron

Ysgol Saron

Newhaven Holiday Park

Newhaven Holiday Park

More inspiration from Wash troughs

View inspiration
GEC Anderson Domestic Bathroom

GEC Anderson Domestic Bathroom

Wapping Hydraulic Power Station

Wapping Hydraulic Power Station

Urban Playground

Urban Playground

Material Source Studio Glasgow | Female Washroom

Material Source Studio Glasgow | Female Washroom