NBS Source
I'm a manufacturer

Huntingtree Primary School

OVERVIEW


The Project


New building built under the Governments flagship Priority School Building Plan.


Demolition of KS1 accommodation and construction of replacement building.


Dudley council received a grant of more than £2.5 million from the Education Skills Funding Agency (ESFA) for the work.

 

 The Challenge

 

All works to being undertaken in a live working educational environment, which places additional demands on the need for the highest health and safety standards on site.

 

Modify vanity units to include for wall panelling to protect the painted walls from splashes from the sinks.

 

 The Solution


Ensure Excelsior fitting teams have all necessary checks in place such a DBS for site works.


Soldi Grade Laminate used through the scheme. Harlequin cubicles with profiled doors and partitions are an industry favourite for KS1 student.


Wall panelling used above the wash basins to aid cleaning and maintenance and prolong the life of the wall finishings.


Specification

Product Range: Harlequin Mariner SGL

Doors: 12mm Solid Grade Laminate, Polyrey, Pomme Verte, P092

Pilaster: 1960mm Overall Height including 150mm Floor Clearance

Partition: 12mm Solid Grade Laminate, Polyrey, Pomme Verte, P092

Ironmongery: SBAA

No featured products in this case study

Contact Excelsior Panelling Systems Ltd by clicking the button below to find out which products were used in this case study.

More inspiration from Excelsior Panelling Systems Ltd

View inspiration
Dudley Leisure Centre

Dudley Leisure Centre

Birmingham City University

Birmingham City University

Altrincham Business Park

Altrincham Business Park

Dudley College

Dudley College