OVERVIEW
Floor preparation products donated by F. Ball and Co. Ltd. have enabled an outbuilding to be turned into a therapy room for Jack Tyreman, from Burythorpe in Yorkshire, who was left with severe head injuries after a road accident four years ago when he was 18.
The room provides a space with amenities, including an entertainment system and sofa, where Jack can relax and enjoy spending time, with the potential for it to house exercise equipment to assist with rehabilitation in the future.
After a botched construction left the original building unusable while exhausting initial funds raised for the project, local tradespeople, including Richard Forbes, owner of Forbes Flooring, stepped up to offer their services for free to complete the project. F. Ball technical representative for the North East, John Rowlands arranged for the donation of flooring installation products. Floorcovering manufacturer Interface also donated LVT and carpet tile floorcoverings.
A team of three fitters from Forbes Flooring began the flooring installation by grinding the surface of the new concrete screed to ensure it was suitably smooth. A moisture test indicated that subfloor relative humidity levels were low enough to proceed with the installation without the requirement of a moisture management solution.
Contractors then primed the subfloor using P131 general-purpose primer before applying Stopgap Fast-Track 30 levelling compound – the fastest setting levelling compound on the market allows floorcoverings to be installed in as little as 45 minutes after application.
Once the levelling compound had cured, a combination of Luxury Vinyl Tiles (LVTs) and carpet tiles was installed over the 40m2 area. Styccobond F46 pressure sensitive adhesive was used to adhere Interface ‘Studio Set’ wood grain LVTs on one half of the room. Styccobond F41 carpet tile tackifier was used to secure Interface graphite-coloured ‘Employ Lines’ carpet tiles. The adhesive dries to a permanently tacky film that will hold loose-lay carpet tiles securely in place when subject to normal foot traffic while allowing them to be lifted and replaced at a later date should they become damaged or worn.
Commenting on the project, Richard Forbes said: “At first, we were asked if we would undertake the work for a fee, but we didn’t want any payment for it. Things can be very cutthroat nowadays, and it’s good to be able to look out for other people. I’d like to thank David Edmondson at Interface as well as John Rowlands at F. Ball for supporting the project. Using F. Ball’s Fast-Track 30 meant that we could achieve a quick turnaround, allowing other trades to do what they needed to.”
On the benefits of the therapy room for Jack, his mum, Julie, added: “It’s got all the things in it a young lad needs and to help him get on with life, as well as a place to relax on his own and with other people. He loves it.”
Styccobond F46 - Flooring Adhesive
Styccobond F41 - Flooring Adhesive
Stopgap P131 - Flooring Primer
Stopgap Fast-Track 30 - Smoothing Compound
Birmingham City Hospital - Ante-natal clinic gets the right treatment with Styccobond F44
Christ Church Primary School - School hall fit for playtime thanks to F Ball
Christ Church School, Frome - F Ball provides adhesives masterclass at Frome school
Eden Court Theatre - F. Ball products star in Eden Court theatre production
Vistry Partnerships select Gypsol on one of their largest regeneration sites in London
Alinabal Inc - smoothing and levelling damaged concrete surfaces
Residential Development, Bristol
Print Press Area, Dublin
London Aquatic Centre - Olympic Pool
DAVID LLOYD LEISURE CLUB
Single Storey House, Fife
Walsall Manor Hospital - Case Study