OVERVIEW
When The Kingsmead Academy in Taunton decided to
construct a new main teaching block, the existing building
had been standing for more than half a century – since the
school first opened in 1953.
The building was in a state of disrepair and needed replacing
with a contemporary block better-suited to the demands
of modern teaching. The school appointed main contractor
Bouygues UK to build the £10 million three-storey teaching
block with a one-storey main hall, and Bouygues turned to
CW Jones Carpet & Flooring to install the floor coverings.
HYTEC E570 ONE COAT - Damp proof membrane
GRIP A526 UNIVERSAL PRIMER - Bonding primer
STIX A300 MULTI FLOOR - Acrylic adhesive
Bostik SL C540 FLOW - Levelling compound
Walsall Manor Hospital - Case Study
The Grange University Hospital - Cwmbran, Wales
Katherine Warington School - Harpenden - Hertfordshire
Oaklands Project - West London
UltraFloor makes homeowners dream come true
UltraFloor gets an 'A' for effort at Derbyshire School
UltraFloor set up home at prestigious housing development
Houses of Parliament - London
UltraFloor passes with flying colours at Dunstable Academy
Walsall Manor Hospital - Case Study
The Grange University Hospital - Cwmbran, Wales
Katherine Warington School - Harpenden - Hertfordshire
Walsall Manor Hospital - Case Study
The Grange University Hospital - Cwmbran, Wales
Katherine Warington School - Harpenden - Hertfordshire
Oaklands Project - West London
London Aquatic Centre - Olympic Pool
DAVID LLOYD LEISURE CLUB
Single Storey House, Fife