OVERVIEW
Technical recommendation and quality subfloor preparation and adhesive products from Bostik have played a key role in
the successful installation of the flooring at the newly opened
Technical recommendation and quality subfloor preparation
Katherine Warington School in Harpenden, Hertfordshire.
Construction of the new secondary school – built to meet
increased demand for school places in the town – was divided
into three phases. First, a temporary teaching building was
created, featuring communal areas, a dining hall and shower
blocks. Second, the main school was constructed. Finally,
phase three of the project saw phase one converted into
a sports hall.
Bostik SL C525 SMOOTH - Smoothing compound
Bostik SL C540 FLOW - Levelling compound
HYTEC E570 ONE COAT - Damp proof membrane
GRIP A526 UNIVERSAL PRIMER - Bonding primer
Bostik Roll - Adhesive tape
Walsall Manor Hospital - Case Study
The Kingsmead Academy, Taunton, Somerset
The Grange University Hospital - Cwmbran, Wales
Oaklands Project - West London
UltraFloor makes homeowners dream come true
UltraFloor gets an 'A' for effort at Derbyshire School
UltraFloor set up home at prestigious housing development
Houses of Parliament - London
UltraFloor passes with flying colours at Dunstable Academy
Walsall Manor Hospital - Case Study
The Kingsmead Academy, Taunton, Somerset
The Grange University Hospital - Cwmbran, Wales
Walsall Manor Hospital - Case Study
The Kingsmead Academy, Taunton, Somerset
The Grange University Hospital - Cwmbran, Wales
Oaklands Project - West London
The Grange University Hospital - Cwmbran, Wales
The Oval Cricket Ground - South London
Norfolk and Norwich University Hospital