OVERVIEW
Manchester’s iconic Midland Hotel sits in the heart of the city centre and has been a well-loved retreat for visitors since opening its doors in 1903. Following decades of service to the city, the hotel had started to show signs of its age, with multiple areas of water ingress across the site that needed to be addressed, to preserve the building for years to come.
It was essential for the hotel to remain fully operational during the roofing refurbishment, with minimal disruption to its customers.
The original single-ply system had failed across the courtyard and atrium roofs, leading to the insulation becoming fully saturated with water. The metal deck’s structural integrity had also been compromised and a structural engineer was appointed to review the extent of the damage, to confirm the area as condemned and in need of immediate replacement.
A bespoke Garland UK specification was designed to upgrade the insulation and U-Value of the hotel to comply with current regulations, remove ponding water on the roof systems with a new tapered insulation design and provide peace of mind to the building owners with a 25-year Garland Single-Point Guarantee.
StressPly® Flex Plus Bitumen System
Alderley Park, Science and Innovation hub
Southampton General Hospital, New Oncology Ward
Fforestfach Transport Depot, Asbestos Overcladding
South Petherwin Primary School, Thermal Efficiency Upgrade
Allenby Barracks
Jesus College
Waverley Court
Colchester County High School