OVERVIEW
The Challenge
Parmiter’s School needed five of their washroom blocks refurbished and work was initially planned to take place during term time for two of the quieter rooms and Summer for the other ones.
The main objective for the school was to increase the amount of cubicles in all the washrooms to accommodate their increased student numbers.
The Solution
Brookhouse, having created a strict methodology for term-time work, was able to refurbish both the Sixth Form Washroom and Gym toilets during term time with minimal disruption.
The washrooms were designed utilising the spaces effectively to obtain the maximum amount of full-height enclosed cubicles which increased capacity by over 30% for each room.
Superbly stylish, practical and highly durable, these solid grade laminate cubicles were the exact finish that Parmiter’s School were hoping for.
We Provided:
Hyperion IPS - Integrated Plumbing System
Aura Vanity Unit - Vanity Unit
Apollo+ Cubicle - Panel Cubicle
Simon Balle School | Washroom Refurbishment
Ashcombe School | Washroom Refurbishment
Tower Supplies Office Refurbishment
Interconnector Office Refurbishment
Concierge Camping
Honiton Swimming Pool
Ysgol Y Bynea
Ysgol Saron
Aberavon Aqua Splash
Ysgol Y Bynea
Ysgol Saron
Newhaven Holiday Park
Helensburgh Leisure Centre Project
St Sidwells Point Leisure Centre Project
The Pyramids Centre Leisure Complex Project
Riverside Ice and Leisure