NBS Source
I'm a manufacturer
Brookhouse

Brookhouse

FF&E | WC Cubicles & IPS: Design, Manufacture, Supply & Installation

+44 (0)345 383 0050 Website

Sort by:

Showing 1-7 of 7

Sponsored
Ashcombe School | Washroom Refurbishment

Ashcombe School | Washroom Refurbishment

Brookhouse

IntroductionAshcombe School was in desperate need of a washroom refurbishment as it was falling into disrepair and was fuelling student behaviour issues. They also required more cubicles, and there was often an unbalanced demand between the boys and the girls.Our SolutionFirstly, Brookhouse needed to understand Ashcombe's pains and create a design to eliminate these as best as possible. It quickly became apparent that they needed a unisex school washroom open to the corridor to create extra space and to mitigate behaviour issues. Many existing toilets were not working, so they needed this completed as soon as possible. The half-term break was identified as a week to carry out the demolition works. The location of the school washroom refurbishment was on the primary school corridor. With the project being carried out during term time, it was essential to ensure this was carefully managed to ensure safeguarding and to cause as little disturbance as possible.We created a design concept with full height cubicles to reduce the issues they were having and specified a trough and automatic infrared taps and soap dispensers to stop the students from filling up the basins and making them overflow. The solid grade laminate school washroom system has a floor & ceiling track to achieve privacy and create an extremely robust washroom that will last for years to come. All fittings are also bolted through to ensure no damage to the laminate.We ProvidedWashroom Design & ConsultancySpace Planning/3D VisualsProject ManagementFull height Solid Grade Laminate School Washroom CubiclesFull Height Solid Grade Laminate IPSButton Flush CisternsDecoration & Hygiene Wall CladdingSolid Surface TroughVinyl FlooringAutomatic Taps and Soap DispensersFull replacement of plumbing worksElectrics and LightingVentilationDDA toilet
Sponsored
Cranmore School | Teaching Wall

Cranmore School | Teaching Wall

Brookhouse

Cranmore School required a new science & technology block to accommodate its current and future needs. The project based on a traditional build was outside of budget and times scales. The school required a partnership that would enable them to design the building and interior quickly and professionally to a DFE specification. They also need a seamless project from design to build. Finding a company that could carry out a turnkey solution was critical to the project’s success. Cranmore School wanted to be able to see into the classroom from the corridor and present students’ work to people in the corridor. They also require the teaching technology to be integrated within the fitted furniture. It was also important to create a new environment which enabled them to still teach with the students in a U but provide an area where the students would carry out group work.
Sponsored
Interconnector Office Refurbishment

Interconnector Office Refurbishment

Brookhouse

Interconnector UK chose to connect with Brookhouse a year in advance of their lease end date. After a vigorous selection process, it was determined that we offered exactly the high standards of assurance and experience, as well as the unique turn-key approach that Interconnector were looking for.The Chief Financial Officer at Interconnector understood the importance of partnering with an all inclusive company. They were therefore glad to find that Brookhouse would not only design and build a space that worked well for them, but could manage the entire project. This ensured the minimisation of risk throughout the project, while also saving valuable time.Interconnector UK had a vision to create an inclusive work environment. They were keen to incorporate more informal space for collaboration, gatherings and stand up meetings, as well as focus working areas and breakout spaces. This worked exceptionally well with their company culture, as Interconnector encourages their workforce to combine both office work and working from home on a regular basis.How Brookhouse helpedWe worked closely with the Interconnector relocation team, designing a space that exceeded the expectations Interconnector set out with. Our relocation efforts were specifically tailored in order to maximise the client’s ROI, as we carefully interpreted the cost analysis of each decision. While working with us, Interconnector also invested in our furniture and workplace consultancy services. This was a move that proved vital in ensuring their new office location became a well-designed space, while also enhancing practicality and productivity of the workforce.Brookhouse managed the property search and viewings, as well as detailed analyses of potential office spaces for the client. All relocation services were undertaken with the end goal of acquiring the ideal space for our clients’ specific needs. In addition to this, we were able to save them a huge sum of money along the way. Due to terms within their lease contract, Interconnector was likely to be charged a large dilapidation sum upon leaving their previous premises. We were able to use our authority on the project and our leverage in the market to renegotiate the financial settlement, saving Interconnector over an astonishing £270,000.Brookhouse were given a tight deadline for completing the fit-out, ensuring that our client wouldn’t be left without an office at any point in the process. We were able to complete the entire strip out and new design installation within just 7 weeks.Always one step ahead, we provided our client with over 80 removals crates, 12 weeks in advance of their move. This gave Interconnector plenty of time to organise and pack up their assets in preparation for their relocation efforts. By the time it came to “move day,” we were delighted to be able to assist Interconnector as they embarked upon their new venture, as our removals team ensured everything went to plan on the day.What we provided:Property Search and ConsultancyNegotiations of HOT and DilapidationsWorkspace ConsultancyFurniture ConsultationFurnitureFlooringGlass PartitionsCovid19 ProtectionDecorationElectrics and LightingBespoke JoineryKitchen & Breakout SpaceRemoval Services
Sponsored
Parmiter's School | Washroom Refurbishment

Parmiter's School | Washroom Refurbishment

Brookhouse

The ChallengeParmiter’s School needed five of their washroom blocks refurbished and work was initially planned to take place during term time for two of the quieter rooms and Summer for the other ones.The main objective for the school was to increase the amount of cubicles in all the washrooms to accommodate their increased student numbers.The SolutionBrookhouse, having created a strict methodology for term-time work, was able to refurbish both the Sixth Form Washroom and Gym toilets during term time with minimal disruption.The washrooms were designed utilising the spaces effectively to obtain the maximum amount of full-height enclosed cubicles which increased capacity by over 30% for each room.Superbly stylish, practical and highly durable, these solid grade laminate cubicles were the exact finish that Parmiter’s School were hoping for. We Provided:Full Height Washroom Cubicles and IPSSolid Grade Laminate (SGL)Contrasting Colour Doors and PanelsAutomatic Infrared Taps & Soap DispensersHygienic Hand-DryersModern Solid Surface TroughStructural SteelDrainage Groundworks
Sponsored
Simon Balle School | Washroom Refurbishment

Simon Balle School | Washroom Refurbishment

Brookhouse

The ChallengeSimon Balle School asked BrookhouseUK to help them create two new Unisex washrooms in their Block 1 and Block 2 Sixth Form areas of the school.The aim was to create open plan washroom spaces but with two sides to them by creating a partial height wall separating the two sides. As the layouts were completely changing and structural work needed to take place, this was a challenging undertaking.Full height IPS cubicles were required with separate vents in each along with new hand washing facilities. Simon Balle School were fully committed to investing in these new modern toilet blocks which future-proofed them for generations to come. They also did not want to wait until the next summer holidays to complete the work.The SolutionBrookhouseUK, having created a strict methodology for term time work, were able to refurbish both washrooms during term-time. We created a design which included demolishing the central dividing wall and installing new half-height partition walls using timber studs and hygiene wall cladding.Two new modern solid surface wash troughs sat on each side of the new walls which included automatic taps and automatic soap dispensers, vastly improving the facilities. Oak effect doors with contrasting dark IPS panels gave the washrooms a fresh, updated look.New automatic dryers were installed to complete the modernisation. Simon Balle School were delighted with the results and have happily recommended BrookhouseUK to other schools. We Provided:Full Height IPSUnisex DesignsContrasting Colour Doors and PanelsAutomatic Taps and Soap DispensersHygienic Hand-DryersModern Solid Surface Trough
Sponsored
Tower Supplies Office Refurbishment

Tower Supplies Office Refurbishment

Brookhouse

Tower Supplies is an industry leader in PPE and workwear.They desperately needed to bring their office up to date to be in line with their operation.There was a need to have a functional office whilst maintaining a hardworking culture. Tower spent time and money with three other office design specialists, on all accounts the designs and solutions blew their budget putting the project out of reach.How we helpedThrough workshops and consultancy we were able to provide a 3 phase project that would provide Tower with the facility they required whilst still operating.We are able to provide a large multi-purpose workspace with kitchen, lunch area, directors offices, presentation area with moving partition, washrooms, shower rooms, reception and meeting spaces.By value engineering the project we were able to provide, within budget, an office with a modern and professional design that reflected the companies industrial roots. We ProvidedOffice DesignSpace Planning / 3D VisualsElectrics and LightingFlooringMoving PartitionsGlass PartitionsCeilingsBespoke JoineryWashroomsFitted FurnitureAudio VisualReception AreasKitchen & Breakout SpaceAgile WorkspaceDecorationAcoustic BafflesAir-ConditioningBlinds
Sponsored
Waddesdon School Unisex Toilets

Waddesdon School Unisex Toilets

Brookhouse

Waddesdon School, a secondary school in Buckinghamshire, had issues with poor behaviour from students in their toilets and there was a shortage of girls toilets causing further problems to the schools. They approached Brookhouse for a solution.Our SolutionAfter visiting the school, our designers determined that the best solution was to create a open unisex washroom. By turning the washrooms into one washroom and creating an opening to the corridor meant that supervision and visibility into the area reduced the behaviour issues. This along with our unique school floor to ceiling cubicle system made in solid grade laminate and bolt through hardware, we were able achieve the durability required. By making the washrooms Unisex also spread out the demand and unutilised all the cubicles.We ProvidedWashroom DesignSpace Planning/3D VisualsProject ManagementDividing Wall Removed & Corridor Opening CreatedNew Waste ServicesFloor to Ceiling Solid Grade Cubicle IPS SytemDecoration & Hygiene Wall CladdingSuspended CeilingsVinyl FlooringElectrics and LightingIndividual Vent to each cubicle

Showing 1-7 of 7