NBS Source
I'm a manufacturer

Vale of Glamorgan Council

OVERVIEW

The primary challenge for Vale of Glamorgan Council was to integrate a battery storage solution into the solar energy system for these residential blocks while ensuring compliance with the newly introduced PAS 63100:2024 regulations. These regulations are designed to minimise the risk of batteries in dwellings becoming a fire hazard and to mitigate the impact should a battery fire occur. The council needed a solution that not only distributed solar energy effectively to the individual flats but also incorporated a safe and efficient battery storage system. This was especially challenging given the need for a community-based battery storage setup that could serve multiple flats from a single solar energy system.

No featured products in this case study

Contact Allume Energy by clicking the button below to find out which products were used in this case study.

More inspiration from Allume Energy

View inspiration
How a developer met EPC goals with customised solar allocation for flats

How a developer met EPC goals with customised solar allocation for flats

Achieving a building of net-zero flats

Achieving a building of net-zero flats

SolShare saves the day in Manchester

SolShare saves the day in Manchester

Wales & West Housing Authority

Wales & West Housing Authority