OVERVIEW

The company’s Dalton manufacturing facility required a new floor coating system, after the previous finish had worn away and become unsafe in places.


Any flooring works had to be completed with minimal disruption to continuing operations, reducing the impact to production as much as possible.


After suitable mechanical preparation during the first phase, vebrores EP HBC was installed across the 1,000 m2 floor area in RAL 7038 Agate Grey.

No featured products in this case study

Contact Vebro Polymers by clicking the button below to find out which products were used in this case study.

More inspiration from Vebro Polymers

View inspiration
REPerformance, Swindon, Wiltshire

REPerformance, Swindon, Wiltshire

329 Edinburgh High Street, Edinburgh, Scotland

329 Edinburgh High Street, Edinburgh, Scotland

P D Hook (Hatcheries), Duns, Scotland

P D Hook (Hatcheries), Duns, Scotland

Jedburgh Grammar Campus, Jedburgh, Scottish Borders

Jedburgh Grammar Campus, Jedburgh, Scottish Borders