NBS Source
I'm a manufacturer
CLT Assembly and Installation

Installation instructions

CLT Assembly and Installation

by KLH UK Ltd

The large KLH® solid wood panels can usually be installed easily and using very few tools. The fully packaged assembly set is delivered directly to the construction site by lorry or container. The relevant installation company (usually a wood construction firm) will check and accept the delivery. The individual components are assembled and screwed together by using appropriate lifting gear. Compared to other construction materials, such as bricks, concrete or steel, KLH® building shells take much less time to be assembled. Follow-up work can start immediately after the components have been assembled, since this is a dry form of construction that does not require any drying time that would otherwise need to be taken into consideration.

No related products in this Installation instructions

Contact KLH UK Ltd by clicking the button below to find out which products were used in this Installation instructions.

More literature from KLH UK Ltd

View all literature (17)
Declaration of Performance

Declaration of Performance

Structural Timber Association - Certificate of Membership

Structural Timber Association - Certificate of Membership

PEFC Certificate - Austria Sawmill By Products

PEFC Certificate - Austria Sawmill By Products

Cross Laminated Timber

Cross Laminated Timber