Installation instructions
Installation instructions
by KLH UK Ltd
Lifting operations using KLH® lifting gear systems with an EC certificate of conformity may only be carried out with suitable lifting equipment and a suitable hanger. Use a high capacity lifting device (minimum diameter 10 mm) in accordance with EN 818-2. Please observe the following procedure for lifting, unloading, interim storing, and assembling: - Visually inspect the installed one-way lifting loops - Hook into all installed lifting loops (hook opening to the outside, please refer to illustration) - Maximum distance between the lifting points 6 m - Inclination angle of the hanger 45° - 60
Contact KLH UK Ltd by clicking the button below to find out which products were used in this Installation instructions.
Declaration of Performance
Structural Timber Association - Certificate of Membership
PEFC Certificate - Austria Sawmill By Products
Cross Laminated Timber