The Granary, Barking
FOAMGLAS®
FOAMGLAS® READY BOARD T4+Architects: Pollard Thomas Edwards ArchitectsConstruction: 2010 - 2012Application: Façade: FOAMGLAS® Slab W+F, 150 mm thick, adhesive fixed;Metal Pitched Roof: FOAMGLAS® READY BOARD T4+, 200 mm thick, adhesive fixedCladding: KME, Tecu BronzeFor the renovation of the façade and the pitched metal roof, FOAMGLAS® was chosen for its resistance to water and for its excellent long-term thermal performance: combined with FOAMGLAS®, the metal roof and façade can last well over 200 years.The grade II listed 120 year old Granary building and the Malthouse are among the oldest buildings within the East London district of Barking and Dagenham. In 2009 the redevelopment master plan was prepared by Schmidt Hammer Lassen Architects. Design for the Granary and Malthouse was carried out by Pollard Thomas Edwards Architects whom certainly achieved the client’s key requirements for sustainability, and energy efficiency.Steve Drury, Rooff development director commented: "At an early stage FOAMGLAS® was specified for its environmental qualities and long term reliability. It is impervious to water and water-vapour and it actually provided an element of exterior weatherproofing as the building works progressed: the interior works could commence whist the metal façade was still being installed. FOAMGLAS® insulation, with its unique cladding fixing system, kept thermal bridging to a minimum; the resulting U-value performance exceeds Building Regulations by more than 25%.With time, the KME Tecu Bronze exterior will take on a natural patina. The metal exterior has a potential lifetime of well over 200 years, hence it’s very important to use the right insulation with a proven long term thermal performance.With FOAMGLAS® thermal ageing does not take place. It is the ideal insulation to be combined with roof and façade materials such as KME Tecu Bronze.For the pitched roof FOAMGLAS® READY BOARD T4+ was bonded and sealed to the timber board structure with PC®11 adhesive. Metal Plates type PC® SP 150/150 were inserted into the FOAMGLAS® READY BOARD. A 180 g/ m2 sanded bitumen membrane was torch applied onto the surface.