NBS Source
I'm a manufacturer
Guttermaster Ltd

Guttermaster Ltd

Aluminium In Construction

+44 (0)1706 869550 Website

Sort by:

Showing 1-11 of 11

Sponsored
Airbus

Airbus

Guttermaster Ltd

Project Overview:Guttermaster, a leading provider of bespoke architectural solutions, partnered with Airbus Defence and Space to supply custom column casings for a project that represented Airbus's local commitment to international programs. Despite budget constraints, the project showcased outstanding collaboration between design, client, and contractor teams, ultimately delivering exceptional value for money.Client Information:Client: Airbus Defence and SpaceLocation: [Specify Location]Project Details:Scope of Works: Supply of bespoke column casingsClient's Requirements:Airbus Defence and Space needed custom column casings for a project that symbolised their dedication to regional execution of international programs. The project objectives were as follows:Custom Design: The column casings needed to align with Airbus's corporate identity, reflecting their commitment to innovation and industry leadership.Budget Constraints: The project had to be executed within a limited budget, making cost-effective solutions essential.Collaborative Execution: The project demanded close collaboration between design, client, and contractor teams to ensure the desired outcome was achieved cost-effectively.Guttermaster's Approach:Guttermaster undertook the project with a focus on innovative design and cost-effective solutions:Custom Column Casing Design: Guttermaster's design team worked closely with Airbus to create bespoke column casings that aligned with Airbus's corporate identity while ensuring affordability.Value Engineering: Guttermaster's engineers utilised value engineering techniques to optimize the materials and manufacturing processes, allowing for cost-effective yet high-quality column casings.Collaboration: The project's success hinged on open communication and collaboration between design, client, and contractor teams, ensuring that the casings met the client's objectives and the budget constraints.Results:The collaborative effort between Guttermaster, Airbus Defence and Space, and the contractors resulted in a project that exceeded expectations:Custom Design: The bespoke column casings perfectly embodied Airbus's commitment to innovation and excellence, serving as a fitting representation of their corporate identity.Budget Adherence: Despite budget constraints, Guttermaster's value engineering approach ensured that the project was delivered within the financial limitations, providing Airbus with excellent value for money.Collaborative Success: The project exemplified the effectiveness of a collaborative team approach, as design, client, and contractor teams worked harmoniously to achieve the desired outcome within the budget.Conclusion:The partnership between Guttermaster and Airbus Defence and Space in supplying bespoke column casings for Airbus's commitment to regional international programs reflects the power of collaboration and innovative design. This project showcases Guttermaster's ability to deliver cost-effective yet high-quality solutions that align with the client's corporate identity and objectives. The resulting column casings represent Airbus's dedication to innovation, collaboration, and industry leadership, making it a compelling embodiment of their mission.
Sponsored
Alerton Synagogue

Alerton Synagogue

Guttermaster Ltd

Project Overview:Guttermaster Limited, a leading provider of bespoke gutter and rainwater solutions, partnered with an architectural firm and a construction contractor to supply and install a unique rainwater management system for a new development. This case study outlines how Guttermaster's collaboration with the architect and contractor resulted in the successful delivery of 300 meters of curved rectangular guttering and 90 meters of Slimline Flush Fix Security Pipe System that aligns with both aesthetic and functional requirements.Project Details:Scope of Works:300 meters of curved rectangular guttering90 meters of Slimline Flush Fix Security Pipe SystemClient's Requirements:The client, a forward-thinking developer, had specific demands for their new development that went beyond conventional rainwater management. They sought a rainwater solution that encompassed the following objectives:Custom Curved Guttering: The rainwater system needed to follow the curvature of the new building, providing a harmonious and visually appealing exterior.Slimline Flush Fix Security Pipe System: To meet the security and anti-vandalism requirements of the development, the rainwater pipe system needed to be flush-mounted for a clean, unbroken appearance. Insurance compliance for anti-vandal products was a key consideration.Integration with Design: The rainwater management system had to seamlessly integrate into the original building design, ensuring a cohesive and stylish appearance.Guttermaster's Approach:Guttermaster approached the project with its trademark attention to detail and expertise in bespoke rainwater solutions:Custom Design Collaboration: The Guttermaster design team worked in close partnership with the architect to create a unique guttering system that perfectly matched the curvature of the building, delivering both aesthetic excellence and functional effectiveness.Slimline Flush Fix Security Pipe Expertise: Guttermaster's Slimline Flush Fix Security Pipe System, ensures it meets both insurance company requirements for anti-vandalism products and the client's preference for clean lines and visual continuity.Seamless Integration: Guttermaster ensured the installation process was executed seamlessly, integrating the rainwater system into the building's original design without compromising its aesthetic appeal.Results:The collaborative efforts of Guttermaster Limited, the architect, and the construction contractor led to a project that exceeded the client's expectations:Aesthetic Excellence: The custom curved guttering solution seamlessly followed the building's curvature, providing an elegant and visually appealing exterior.Security and Vandal Resistance: The Slimline Flush Fix Security Pipe System met insurance company requirements and provided an anti-vandal solution that was incorporated into the building's original design, enhancing the development's security measures.Integration and Functionality: The rainwater management system's integration into the building's design not only met aesthetic expectations but also demonstrated Guttermaster's commitment to providing a functional solution that met the client's unique needs.Conclusion:The collaboration between Guttermaster Limited, the architectural firm, and the construction contractor in supplying and installing 300 meters of curved rectangular guttering and 90 meters of security flush fix rainwater pipe exemplifies the value of teamwork in delivering a tailored rainwater solution. This project showcases Guttermaster's dedication to creating exceptional rainwater systems that combine aesthetics, security, and functionality while adhering to strict insurance company requirements. It also emphasizes the growing importance of incorporating anti-vandal and anti-climb products in the original design of a building to meet modern security demands.
Sponsored
Hampton House

Hampton House

Guttermaster Ltd

Project Overview:The iconic Hampton House, located in the heart of London, consists of three striking towers known as "The Corniche." Rising to heights of 85 meters and spanning 15 to 27 storeys, these towers house 253 apartments, office spaces, a restaurant, cafe, bar, gym, pool, and spa area. The towers offer breathtaking views of prominent landmarks such as Westminster Palace, Tate Britain, and the London Eye. The distinctive architectural design with arched structures allows for panoramic views and an abundance of natural light. Guttermaster Limited played a significant role in providing Concealed Rainwater Pipes, Soffits, and Bespoke Fabrications to adapt to the building's unique arched layout, offering custom solutions to meet the project's specific requirements.Project Details:Scope of Works:Concealed Rainwater PipesSoffitsBespoke FabricationsProject Challenges:The primary challenge of the project was to adapt all aluminum profiles to the arched layout of the building. Given the distinctive architectural design of The Corniche, a number of custom solutions had to be developed to ensure that Guttermaster's products were seamlessly integrated with the building's structure.Guttermaster's Approach:Guttermaster Limited embraced the project's unique challenges with a focus on custom design, precision engineering, and innovative solutions:Custom Fabrication Expertise: Guttermaster's team developed a Concealed Rainwater Pipe system, Soffits, and Bespoke Fabrications that could seamlessly conform to the arched layout of the project.Adaptive Engineering: Innovative engineering techniques were employed to ensure the concealed rainwater pipe joints could expand with floor-to-floor concrete movement and also provide efficient rainwater management.Balancing Form and Function: The challenge of maintaining architectural integrity while delivering effective rainwater solutions was met through the creation of custom profiles that were both visually pleasing and functional.Results:The collaborative effort between Guttermaster Limited and the project team resulted in the successful integration of Concealed Rainwater Pipes, Soffits, and Bespoke Fabrications at Hampton House:Architectural Synergy: The custom-designed Guttermaster solutions seamlessly integrated into the arched design of the building, preserving its distinctive form and allowing for an abundance of natural light while efficiently managing rainwater.Enhanced Aesthetics: The project showcased Guttermaster's ability to balance form and function, ensuring that the concealed rainwater pipes, soffits, and bespoke fabrications contributed to the building's exterior aesthetics.Innovative Engineering: The custom solutions demonstrated the innovation and adaptability of Guttermaster's engineering team, creating profiles that met the specific needs of the project.Conclusion:The success of Guttermaster Limited in providing Concealed Rainwater Pipes, Soffits, and Bespoke Fabrications for Hampton House, The Corniche, exemplifies the company's dedication to delivering tailored, aesthetically pleasing, and functional rainwater solutions. This project underscores the value of precision engineering, custom design, and the ability to adapt to unique architectural challenges, resulting in a harmonious and iconic addition to London's skyline that seamlessly integrates aesthetics with rainwater management.
Sponsored
Hemisphere

Hemisphere

Guttermaster Ltd

Project Overview:The Hemisphere Project marked a unique architectural venture where Guttermaster Limited played an integral role in shaping the project from its inception. Collaborating closely with Ruddle Wilkinson Architects and Stoneguard (Midlands) Ltd, Guttermaster was tasked with designing and manufacturing 960 meters of bespoke aluminium copings, alongside providing 90 meters of TrimFix fascia, aluminium rainwater pipes, and cast aluminium hoppers. This case study unveils the meticulous planning and execution that resulted in a stunning architectural statement with bold symmetrical lines surrounding the entire building.Project DetailsScope of Works:960 meters of bespoke SnapLok cappings90 meters of TrimFix fasciaAluminium rainwater pipesCast aluminium hoppersClient's Requirements:The client, driven by a vision for a distinctive and iconic architectural statement, outlined their objectives for the project:Architectural Finesse: The project aimed to create an architectural masterpiece with bespoke aluminium copings, challenging Guttermaster to deliver on design, quality, and execution.Symmetrical Roof Edge: The roof edge required bold and symmetrical lines to accentuate the building's aesthetics.Collaborative Design: Guttermaster was involved from the project's conception stage and had to work in close collaboration with Ruddle Wilkinson Architects and Stoneguard (Midlands) Ltd to bring the design to life.Guttermaster's Approach:Guttermaster's role in this ambitious project was characterised by a blend of precision and collaborative innovation:Custom Design and Engineering: The Guttermaster design team embarked on creating complex bespoke aluminium copings that adhered to the architect's vision. This involved advanced engineering to ensure structural integrity and aesthetic excellence.Symmetrical Lines: Guttermaster devised a slim edge perimeter feature aluminium coping with secondary support, ensuring that the roof edge featured bold and symmetrical lines that embraced the entire building.Collaborative Development: From the very start, Guttermaster worked hand in hand with the architectural and construction teams, ensuring seamless integration of their solutions into the project's design and construction plans.ResultsThe collaborative effort between Guttermaster Limited, Ruddle Wilkinson Architects, and Stoneguard (Midlands) Ltd yielded remarkable results:Architectural Masterpiece: The bespoke aluminium copings, SnapLok cappings, TrimFix fascia, aluminium rainwater pipes, and cast aluminium hoppers combined to create an architectural masterpiece that surpassed the client's expectations.Bold Symmetrical Lines: The roof edge, with the slim edge perimeter feature aluminium coping, displayed bold and symmetrical lines, enhancing the building's visual appeal.Seamless Integration: Guttermaster's proactive involvement from the project's conception ensured that their solutions were seamlessly integrated into the architectural and construction plans, contributing to the project's overall success.ConclusionThe Hemisphere Project stands as a testament to the power of precision, collaborative design, and innovative engineering in creating a distinctive architectural masterpiece. Guttermaster's role in the project showcased their commitment to delivering bespoke solutions that enhance architectural vision and bold symmetrical lines. This project serves as a striking example of how expert collaboration can transform a vision into reality, producing an iconic and visually appealing building that captivates all who encounter it.
Sponsored
Manor Farm

Manor Farm

Guttermaster Ltd

Project Overview:Guttermaster Limited played a pivotal role in the meticulous restoration of Manor Farm, a historical building. This case study highlights Guttermaster's key contributions in preserving the heritage aesthetics by supplying a number of solutions, including cast aluminium guttering, extruded rainwater pipe, and cast hoppers. The primary objective of this heritage project was to retain the timeless charm of Manor Farm while ensuring effective rainwater management.Project Details:Scope of Works:Supply of cast aluminium guttering, extruded rainwater pipe, and cast hoppersClient's Requirements:The restoration of Manor Farm aimed to preserve its historical charm while addressing the need for efficient rainwater management. The client's key project requirements included:Historical Preservation: The need to retain the authenticity and heritage aesthetics of Manor Farm during the restoration.Functional Rainwater Management: Effective rainwater drainage and collection without compromising the visual integrity of the heritage site.Collaborative Design: A collaborative approach between Guttermaster and the restoration team to seamlessly integrate modern functionality with timeless heritage aesthetics.Guttermaster's Approach:Guttermaster Limited approached the Manor Farm restoration project with a meticulous blend of historical preservation and modern functionality:Bespoke Solutions Selection: Guttermaster's expertise led to the selection of cast aluminium guttering, extruded rainwater pipe, and cast hoppers for their durability, classic appeal, and ability to seamlessly complement heritage architecture.Functional Integration: The extruded rainwater pipe, designed for optimal rainwater flow, and the cast hoppers were chosen to add functional elements without compromising the visual integrity of the heritage site.Fine Texture Powder-Coated Finish: Guttermaster's commitment to maintaining the authenticity of Manor Farm was evident in the fine texture powder-coated finish applied to the supplied components. This finish enhanced durability and ensured seamless integration into the heritage environment.Results:The collaboration between Guttermaster Limited and Manor Farm resulted in a successful restoration project:Harmonious Blend: The cast aluminium guttering seamlessly complemented the heritage architecture, achieving a harmonious blend of historical preservation and contemporary efficiency.Functional Elegance: The extruded rainwater pipe and cast hoppers added functional elements without compromising the visual integrity of Manor Farm, ensuring effective rainwater management.Fine Texture Powder-Coated Finish: The applied finish enhanced the durability of the supplied components and seamlessly integrated them into the heritage environment, contributing to the overall visual appeal of the project.Conclusion:The supply of cast aluminium guttering, extruded rainwater pipe, and cast hoppers by Guttermaster contributed to the successful restoration of Manor Farm. This case study exemplifies the importance of expert collaboration in heritage projects, where attention to detail and a commitment to preserving historical aesthetics are paramount. Guttermaster's role in providing both functional and visually complementary rainwater management solutions underscores the significance of maintaining heritage integrity in architectural restoration.
Sponsored
Morrisons

Morrisons

Guttermaster Ltd

Project OverviewGuttermaster Limited played a pivotal role in the renovation of the Morrisons store in York by supplying Moulded No.46 Gutter and Square Retro Rainwater Pipe systems. This case study highlights the successful collaboration between Guttermaster and the Morrisons project team, resulting in an efficient and visually appealing rainwater management solution for the store.Project DetailsScope of Works:Supply of Moulded No.46 GutterSupply of Square Retro Rainwater PipeClient's RequirementsMorrisons sought an upgraded rainwater management system for their store in York. The primary project objectives were as follows:Efficient Rainwater Management: Morrisons required a modern and efficient rainwater management system to replace the existing one.Aesthetic Enhancement: The new system needed to enhance the visual appeal of the store's exterior, aligning with Morrisons' commitment to a pleasing shopping environment.Guttermaster's ApproachGuttermaster Limited approached the project with a focus on efficient and aesthetically pleasing rainwater solutions:Moulded No.46 Gutter Selection: Guttermaster recommended the Moulded No.46 Gutter system due to its efficiency and capacity for rainwater management, which was well-suited for the store's needs.Square Retro Rainwater Pipe Selection: The Square Retro Rainwater Pipe was chosen for its clean lines and modern aesthetic, contributing to the store's exterior enhancement.Precise Supply: Guttermaster ensured the accurate supply of both systems, meeting the project's requirements.ResultsThe collaboration between Guttermaster Limited and Morrisons led to a successful project:Efficient Rainwater Management: The supplied Moulded No.46 Gutter system significantly improved rainwater management, reducing the risk of flooding and water damage to the store.Enhanced Aesthetics: The supplied Square Retro Rainwater Pipe provided a clean, modern look that enhanced the store's visual appeal, aligning with Morrisons' commitment to a pleasing shopping environment.Reliable Rainwater Solution: Guttermaster's supply ensured that the systems could perform reliably and efficiently for the long term, contributing to Morrisons' operational efficiency.ConclusionThe successful supply of Guttermaster's Moulded No.46 Gutter and Square Retro Rainwater Pipe systems to Morrisons, York, exemplifies the company's dedication to delivering efficient and visually appealing rainwater management solutions. This project showcases the power of collaboration in achieving effective rainwater management and enhancing a store's exterior appearance to create a more pleasing shopping environment for customers.
Sponsored
Quintana Gate

Quintana Gate

Guttermaster Ltd

Project Overview:Guttermaster Limited played a pivotal role in the development of the Quintana Gate project, a modern residential new build. This case study outlines Guttermaster's key contributions in providing tailored rainwater management solutions that seamlessly blend functional efficiency with contemporary aesthetics.Project Details:Scope of Works:Supply of Flush Joint Pipe, SnapLok Capping, and aluminium rainwater hoppersProject Goals:The Quintana Gate project aimed to achieve both functional efficiency and contemporary aesthetics in rainwater management for a modern residential development. The key project goals included:Functional Efficiency: Efficient rainwater conveyance and collection tailored to the needs of a modern residential building.Contemporary Aesthetics: Sleek, modern design elements that enhance the overall visual appeal of the residential development.Guttermaster's Approach:Guttermaster Limited approached the Quintana Gate project with a focus on providing advanced rainwater management solutions that marry functionality with contemporary design:Tailored Rainwater Solutions: Guttermaster supplied Flush Joint Pipe, chosen for its streamlined design and efficient water conveyance, meeting the specific needs of a modern residential development.SnapLok Capping for Parapet Wall Finishing: The inclusion of SnapLok Capping provided a clean and polished look to the building’s exterior, showcasing Guttermaster’s commitment to contemporary design and adding a touch of sophistication.Aluminium Rainwater Hoppers: Guttermaster supplied aluminium rainwater hoppers, emphasizing the company’s dedication to delivering comprehensive rainwater management solutions. These hoppers ensured efficient water collection and added a visually appealing element to the building’s exterior.Results:The collaboration between Guttermaster Limited and the Quintana Gate project managers resulted in the successful implementation of advanced rainwater management systems:Functional Efficiency: The Flush Joint Pipe, with its streamlined design, contributed to the overall functionality of the project, efficiently conveying rainwater in line with modern residential needs.Contemporary Aesthetics: The inclusion of SnapLok Capping added a touch of sophistication to the building’s exterior, enhancing the modern aesthetic appeal of the residential development.Visual Appeal: Aluminium rainwater hoppers not only ensured efficient water collection but also added a visually appealing element, contributing to the overall aesthetic success of Quintana Gate.Conclusion:The supply of Flush Joint Pipe, SnapLok Capping, and aluminium rainwater hoppers by Guttermaster contributed to the overall success of the Quintana Gate project. This case study highlights the importance of collaboration between industry experts and showcases Guttermaster’s ability to provide advanced and visually appealing rainwater management solutions for modern residential developments. The project exemplifies the synergy between functionality and contemporary design in the realm of new construction.
Sponsored
Stalybridge Station

Stalybridge Station

Guttermaster Ltd

Bespoke I-Beam Fascia for Stalybridge StationProject Overview:Guttermaster Limited, a leading provider of bespoke architectural gutter and fascia systems, took on a significant role in the revitalisation of Stalybridge Station. This case study highlights the successful supply of Guttermaster's bespoke I-Beam Fascia and emphasises the outstanding collaborative effort between the design, client, and contractor teams. The result was an aesthetically pleasing and cost-effective solution that added significant value to the project.Project Details:Scope of Works:Supply of bespoke I-Beam FasciaClient's Requirements:Stalybridge Station, a key transportation hub, required a facelift to enhance its visual appeal while maintaining functionality. The client's key project requirements included:Bespoke Fascia Solution: The need for a bespoke fascia system that aligned with the architectural vision of the station's revitalisation.Aesthetic Enhancement: The fascia system should contribute to the overall aesthetic improvement of Stalybridge Station, enhancing its visual appeal for commuters and visitors.Collaborative Design: A collaborative approach between the design, client, and contractor teams to ensure seamless integration of the bespoke I-Beam Fascia.Guttermaster's Approach:Guttermaster Limited approached the Stalybridge Station project with a commitment to precision and collaboration:Bespoke I-Beam Fascia Design: The Guttermaster design team collaborated closely with the project's design architects to create a bespoke I-Beam Fascia that met both aesthetic and functional requirements.Material Expertise: The use of high-quality materials in the I-Beam Fascia system ensured durability and longevity, meeting the client's expectations for a long-term solution.Seamless Integration: Guttermaster facilitated open communication and collaboration between the design, client, and contractor teams, ensuring that the I-Beam Fascia was seamlessly integrated into the overall revitalization plan.Results:The collaborative efforts between Guttermaster Limited, the design architects, and the contractors at Stalybridge Station led to a highly successful project:Bespoke Aesthetic Solution: The bespoke I-Beam Fascia delivered a unique and visually appealing solution that perfectly complemented the revitalisation efforts at Stalybridge Station.Durability and Longevity: Guttermaster's choice of high-quality materials ensured that the I-Beam Fascia not only met the aesthetic requirements but also provided a durable and long-lasting solution.Collaborative Value for Money: The outstanding collaborative approach between the design, client, and contractor teams resulted in extremely good value for money, delivering a cost-effective solution without compromising on quality.Conclusion:The supply of Guttermaster's bespoke I-Beam Fascia for Stalybridge Station exemplifies the company's dedication to precision and collaboration in providing tailored solutions. This project stands as a testament to the successful partnership between Guttermaster Limited and the project teams, resulting in a visually appealing and cost-effective enhancement to Stalybridge Station's architecture.
Sponsored
Thomas Rotherham College

Thomas Rotherham College

Guttermaster Ltd

Project OverviewGuttermaster Limited played a pivotal role in enhancing and maintaining Thomas Rotherham College, a prestigious educational institution. This case study focuses on the successful supply of Guttermaster's Serpentine Gutter, showcasing how the project team collaborated to upgrade the college's rainwater management system and preserve its architectural integrity.Project DetailsScope of Works:Supply of Serpentine GutterClient's Requirements:Thomas Rotherham College sought a modern, efficient, and visually appealing rainwater management system to replace its aging guttering. The primary project objectives were as follows:Upgraded Rainwater System: The college required a new, high-performance rainwater system to replace the existing, deteriorating one.Architectural Preservation: The new system needed to seamlessly integrate into the college's architectural design, preserving the institution's historical and aesthetic charm.Guttermaster's Approach:Guttermaster Limited approached the project with an emphasis on innovative design and the supply of high-quality rainwater management materials:Historical Preservation: The design and supply of materials took into account the college's historical architectural elements, ensuring that the modern guttering components would seamlessly blend with the existing structure.Efficiency and Durability: The Serpentine Gutter was engineered for optimal rainwater management, offering high performance, durability, and low maintenance to meet the college's long-term needs.ResultsThe collaborative effort between Guttermaster Limited and Thomas Rotherham College resulted in an exemplary project:Upgraded Rainwater System: The supply of the Serpentine Gutter system effectively replaced the aging rainwater management system, ensuring efficient water drainage and collection.Architectural Integration: Guttermaster's design and supply maintained the college's architectural integrity. The new Serpentine Gutter components seamlessly blended with the historical features, enhancing the overall appearance of the institution.Long-Term Solution: The project provided the college with high-quality, low-maintenance rainwater system components that will serve its needs for many years to come, reducing maintenance costs and ensuring the preservation of the building's historic character.ConclusionThe successful supply of Guttermaster's Serpentine Gutter for Thomas Rotherham College exemplifies the company's commitment to delivering high-quality rainwater management solutions that balance functionality with architectural preservation. This project showcases the power of effective collaboration and innovation in ensuring that an educational institution not only maintains its historical charm but also benefits from a modern, efficient rainwater system that will serve its needs for many years to come.
Sponsored
Tim Hortons

Tim Hortons

Guttermaster Ltd

Project Overview:Guttermaster Limited, a leading supplier of bespoke architectural gutter and fascia systems, was approached to supply a Tim Hortons new build restaurant with a high-quality Aluminium Bullnose Fascia for their new restaurant in Washington. The project aimed to combine functionality and aesthetics to create an inviting and visually appealing exterior for the restaurant. This case study highlights the outstanding collaborative efforts between the design, client, and contractor teams, which ultimately resulted in exceptional value for money.Client's Requirements:Tim Hortons, a renowned fast-food chain, had specific requirements for their new restaurant's exterior. They needed an attractive, durable, and low-maintenance fascia system to complement their brand image and withstand the elements of the local climate. The key project requirements were:Custom Design: A bespoke Aluminium Bullnose Fascia that aligns with Tim Hortons' branding and architectural preferences.Durability: A long-lasting and corrosion-resistant fascia system that can withstand the region's weather conditions.Low Maintenance: A solution that requires minimal maintenance and remains visually appealing over time.On-Time Delivery: Timely delivery to ensure the project's construction timeline was not compromised.Guttermaster's Approach:Guttermaster Limited is renowned for its expertise in providing bespoke gutter and fascia solutions for commercial and residential projects. In response to Tim Hortons' requirements, Guttermaster adopted a systematic approach:Design Collaboration: The design team at Guttermaster collaborated closely with Tim Hortons' architects and contractors to create a custom Aluminium Bullnose Fascia that met the design and branding expectations. This involved multiple design iterations and feedback sessions.Material Selection: Guttermaster recommended the use of high-quality, corrosion-resistant aluminium for the fascia, ensuring durability and low maintenance.Manufacturing Excellence: Guttermaster's skilled craftsmen used advanced manufacturing techniques to create precision-engineered fascia components that were easy to install and aesthetically pleasing.Timely Delivery: Guttermaster maintained open communication with the construction contractor to ensure the fascia components were delivered on time and without delays, adhering to the project timeline.Results:The collaborative effort between Guttermaster, Tim Hortons, and the construction contractor resulted in a highly successful project that met all the client's requirements:Aesthetic Excellence: The custom Aluminium Bullnose Fascia created by Guttermaster perfectly matched Tim Hortons' branding, enhancing the restaurant's exterior appearance.Durability: The use of aluminium ensured that the fascia would remain corrosion-free.Low Maintenance: The low-maintenance nature of the aluminium fascia reduced ongoing costs for Tim Hortons, ensuring the restaurant's exterior remained attractive for years to come.On-Time Delivery: Guttermaster's commitment to timely delivery ensured that the project stayed on schedule, avoiding construction delays and cost overruns.Conclusion:Guttermaster Limited's collaboration with Tim Hortons in supplying bespoke Aluminium Bullnose Fascia for their new restaurant in Washington is a prime example of how effective teamwork between the client, designer, and contractor can lead to exceptional value for money. The result is an aesthetically pleasing, durable, and low-maintenance exterior that aligns perfectly with Tim Hortons' brand image. This project demonstrates Guttermaster's commitment to delivering high-quality architectural solutions tailored to the unique needs of their clients.
Sponsored
Weston College

Weston College

Guttermaster Ltd

Project Overview:Weston College in Weston-super-Mare embarked on an expansion project to house Sixth Form, Art and Music Technology faculties, along with central facilities like the Learning Resource Centre and a restaurant. The college sought a distinctive perimeter feature for the new building, and Guttermaster Limited was engaged to provide a solution. This case study details how the manufacture of 800 meters of SnapLok capping and 300 meters of TrimFix fascia by Guttermaster enhanced the architectural vision and achieved bold symmetrical lines around the project.Project Details:Scope of Works:800 meters of SnapLok Capping300 meters of TrimFix fasciaClient's Requirements:Weston College aimed to create an iconic and aesthetically striking perimeter feature for their new development. Key project objectives were:Perimeter Feature: The college wanted a distinctive roof edge that would serve as a striking architectural feature for the new building.Symmetry and Precision: To achieve the desired aesthetic, the roof edge needed to have bold and symmetrical lines around the entire project.Architectural Vision: The solution provided had to align with the architect's vision, enhancing the overall appearance of the building.Guttermaster's Approach:Guttermaster Limited approached this project with a focus on precision and collaboration:Custom Design Integration: Guttermaster's design team worked closely with the architect to create a fully welded curved solution. The design was meticulously engineered to ensure that the SnapLok Capping and TrimFix fascia seamlessly matched the architectural vision.Symmetrical Lines: Guttermaster ensured that all junctions between eaves and verge were perfectly aligned to create bold, symmetrical lines that encircled the entire building, achieving the desired perimeter feature.Results:The partnership between Guttermaster Limited and Weston College resulted in a project that surpassed all expectations:Distinctive Perimeter Feature: The fully welded curved solution using SnapLok capping and TrimFix fascia systems created a distinctive and visually appealing roof edge, serving as a notable architectural feature.Symmetrical Lines: Guttermaster's meticulous approach ensured that the roof edge featured bold and symmetrical lines around the entire building, meeting the project's design objectives.Architectural Enhancement: The installed systems perfectly aligned with the architect's vision, enhancing the overall appearance of Weston College's expansion project.Conclusion:The collaboration between Weston College and Guttermaster Limited in implementing 800 meters of SnapLok capping and 300 meters of TrimFix fascia systems exemplifies the power of precision and teamwork in achieving a unique and bold perimeter feature. This project underscores Guttermaster's commitment to delivering custom solutions that enhance architectural vision and aesthetic excellence. The result is a roof edge that not only adds visual appeal but also represents a striking architectural feature for Weston College in Weston-super-Mare.

Showing 1-11 of 11