NBS Source
I'm a manufacturer
Compare variants

Calcium sulphate raised access floor - NORTEC

Verified by manufacturer 6 months ago

NORTEC G 30 ST x M

Lindner Group Variant:
Third party certifications:
  • EPD

    EPD

    Certificate type

  • ISO 14001 Environmental Management Systems

    Certificate type

  • EnMS ISO 50001

    EnMS ISO 50001

    Certificate type

  • ISO 9001 Quality Management

    Certificate type

A range of calcium sulfate raised access floors.

Jump to:
BOS
020 8246 6333 Website

Application

NORTEC G 30 ST x M and NORTEC L 30 x M

  • Rooms and corridors in residential buildings and hotels.
  • Offices, hospitals, surgeries, ward rooms.


NORTEC L 38 ST x H

  • Hospitals, treatment rooms.
  • Computer rooms and control rooms.
  • Churches, cinemas, congress halls, museums, showrooms.
  • Retail and department stores.


NORTEC U 34 ST x H

  • Offices, hospitals, surgeries, ward rooms.
  • Computer rooms and control rooms.
  • School rooms, restaurants, concert halls, auditoriums.
  • Factories and workshops with light use.

Description

NORTEC raised access floors are suitable for wide range of applications. The floor panels consist of fibre-reinforced calcium sulphate and are applied with a steel sheet on the lower side. The panels are protected against shock and humidity by an edge trim on all edges. The substructure consists of height-adjustable zinc-coated steel pedestals which form the necessary cavity for installations and gaskets for sound decoupling.


Features and benefits:

  • Very high loadability.
  • Non-combustible.
  • Simple lifting and exchanging of single panels.
  • Wide choice of coverings.
  • Earthquake safety: International Building Code (IBC) available in A–F.
  • Cradle to Cradle Certified Silver (NORTEC L 30 x M).
  • Environmental product declaration to ISO 14025 and ISO 14021 (NORTEC L 30 x M).


System comprises:

  • Panel: Fibre-reinforced calcium sulfate panel, steel sheet on lower side, surrounding edge trim protection against damage and humidity, edges inclined.
  • Pedestal: Precisely height adjustable, manufactured from galvanized steel, precision threaded bolt.
  • Gasket: Manufactured from plastic material, vaulted surface.
  • Wall connection: Pre-stressed foam rubber, for acoustic insulation and absorption of horizontal movements.


Suitable floor coverings are system dependent and include elastic, textile, loose-laid, WOODline and STONEline.

General information

Color

White

Finish

Other

Material

Steel

Guidance for specification option:

Zinc-coated.

Calcium sulphate

Shape

Square

Length

600 mm

Width

600 mm

Height

600 mm

Warranty description

25 year

Uniclass

Ss_30_20_70_70 Raised access floor systemsPrimary

CAWS

K41/130 Raised access floor

Product range

Lindner Raised Access Floor / NORTEC

Specification data - Raised access floor systems

System performance

Carrier panel to BS EN 13501, A1 (non-combustible); to DIN 4102-1, A2 (non-combustible).

Support structure type

Access floor pedestals, zinc-coated steel.

Guidance for specification option:

Pedestal spacing: 600 x 600 mm.

Raised access floor surface

Raised access floor panels, fibre-reinforced calcium sulphate with a steel sheet on the lower side and trim on all edges.

Calculated weighted sound reduction index (Rw)

To ISO 140, 61 dB.

Fire resistance

None.

To DIN 4102-2, F30.

Load class

To EN 12825, 1A.

Guidance for specification option:

2 kN.

Manufacturer guidance

Load and deflection class.

LoadSafetyFactor

To EN 12825, 2.

Panel Thickness

30.5 mm.

Pedestal height

-

Manufacturer guidance

25–2000 mm. Insert requirements.

Weight

Approximately 44 kg/m².

Manufacturer guidance

Weight of system with a floor height of 150 mm.

Sustainability data

Contains Red List materials

No

Country of material origin

Germany

Country of product manufacture

Germany

Material

Steel

Guidance for specification option:

Zinc-coated.

Calcium sulphate

Manufacturing plant location

Recyclability

yes

Recycled content

As defined in clause 7.8 of BS EN ISO 14021

100 %

Expected Life

50 year

Third party certifications

BIM objects

BOS

NBS BIM Object Standard

This BIM object has been authored to meet the requirements of the NBS BIM Object Standard.

Find out more about the NBS BIM Object Standard.

Platform Compatible Version
Revit
-

1

IFC
-

1

Third party certifications

EPD

EPD

Raised Floor system, Type NORTEC

ISO 14001 Environmental Management Systems

ISO 14001 Environmental Management Systems

ISO 14001

EnMS ISO 50001

EnMS ISO 50001

ISO 50001

ISO 9001 Quality Management

ISO 9001 Quality Management

ISO 9001 TUV Management Services

Literature

Brochure Lindner Raised Floor Systems

Brochure Lindner Raised Floor Systems

Case studies

MOL campus - Floor and more G40 and NORTEC

MOL campus - Floor and more G40 and NORTEC

Wembley Stadium

Wembley Stadium

Central Station Berlin
Completed Works:
- Metal Ceiling
- FLOOR and more
- NORTEC
- Plasterboard partition systems
- Fire protection doors

Central Station Berlin Completed Works: - Metal Ceiling - FLOOR and more - NORTEC - Plasterboard partition systems - Fire protection doors

GBC 5 - VENTEC - NORTEC- FLOOR and more

GBC 5 - VENTEC - NORTEC- FLOOR and more

Similar products from Lindner Group

Calcium sulphate raised access floor with factory applied parquet - NORTEC STONEline

LIGNA S 38 ST x M - Chipboard Raised Access Floor

LIGNA S 38 ST x M - Chipboard Raised Access Floor

LUMEN H 38 x H - Raised Access Floor System

LUMEN H 38 x H - Raised Access Floor System

NORTEC L 30 x M - Raised Access Flooring

NORTEC L 30 x M - Raised Access Flooring

NORTEC L 38 ST x H - Raised Access Floor System NORTEC

NORTEC L 38 ST x H - Raised Access Floor System NORTEC

NORTEC L 38 x M - Raised Access Floor Panel

NORTEC L 38 x M - Raised Access Floor Panel

NORTEC Power - Heavy duty calcium sulphate raised access floor

NORTEC Power - Heavy duty calcium sulphate raised access floor

NORTEC U 34 ST x H - Calcium Sulphate

NORTEC U 34 ST x H - Calcium Sulphate

Stand construction - FLOOR and more® arena

Stand construction - FLOOR and more® arena