OVERVIEW
Lionweld Kennedy designed, fabricated and supplied steel grating, handrails, ladders and gates for the 'Shah Deniz' stage 2 offshore facility, owned by Tekfen Construction.
Supplying 'safegrid', 'safetreads' and 'saferails' which were fabricated to fit the specifications of the client provided them with an efficient and compliant flooring solution.
Our flooring will add a further 16 billion cubic meters per year (bcma) of gas production to the approximately 9 bcma produced by Shah Deniz Stage 1.
Shah Deniz Stage 2, will help increase European energy security by bringing Caspian gas resources to markets in Europe for the very first time.
Handrail Tubular Stanchions
Safegrid Forge Welded Steel Grating - 20mm Ball Proof - Steel Grating and Open Mesh Flooring
Chirag Oil Field
GDF Suez Cygnus Bravo
Solan Topside
Clair Ridge Oil Field
Stauning Whisky’s distillery - gratings
New Air BP Jet Fuel Station - plank gratings
HMS Victory - plank gratings
Platforms and stairs for grandstand systems - plank gratings
ASF 5006 Handrailing at Bradford Library Steps
ASF 5006 post and rail, post and panel and step handrailing, Sale Town Hall
White City, London. Illuminated handrailing
Hilton Garden Inn, Terminal 2, Heathrow Airport