OVERVIEW
The interior fit-out of the POST Headquarters is the largest contract to date for the Lindner Group in Luxembourg.
Lindner installed the FLOOR and more®, FLOOR and more® comfort and NORTEC hollow and raised floor systems with modern carpeting.
The glass partitions Lindner Life Freeze 137, Lindner Life Pure 620 and Lindner Life Stereo 125 as fire protection glazing in EI60 provide an elegant separation of the offices. The wooden partition wall Lindner Logic Timber with long-lasting varnish, on the other hand, acts as an antagonist to the transparent glass elements.
Perfectly matched to the partition walls, the associated doors were also made of wood or glass.
Completed Works
Lindner Raised Floor Pedestals Type S
Lindner FLOOR and more® G 40 x L/D
LIGNA S 38 ST x M - Chipboard Raised Access Floor
Lindner Raised Floor Pedestals Type M
Single Glazed - No Fire Rating - Frameless glass partition
Lindner Raised Floor Pedestals Type H
Double Glazed - No Fire Rating - Double glazed modular partition
Solid Double - No Fire Rating - Solid partition
Projektreport Allerhuset Denmark
Maxwell Centre, University of Cambridge
John Lewis Oxford Street
Wembley Stadium
cGMP Advanced Manufacturing Area for Orthoplastics
Compound Semiconductor Innovation Centre for CSA Catapult
The Compound Semiconductor Facility for IQE
cGMP Global Packing Centre for AstraZeneca
Gresham Apartments, Raised Acoustic Floor - Nottingham UK
SubFloor Acoustic Raised Floor, Renovating 12 Apartments in Nottingham
Transforming a Listed Museum Near Liverpool into a modern Meeting Space using SubFloor
Transforming an Attic into an Energy-Efficient Storage Space in South Wales with SubFloor Raised Flooring
The Cube
Birmingham Library
The Shard
HAUSER CB - Metal Ceilings, LIGNA and NORTEC raised floors
Nova N2 Development - London - Modular Washrooms
MOL campus - Floor and more G40 and NORTEC
INTERNATIONAL RUGBY EXPERIENCE -> FLOOR and more®
GBC 5 - VENTEC - NORTEC- FLOOR and more